[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"atspace-main-nav":3,"blog-post-why-part-l-evidence-is-becoming-a-problem-for-builders-at-handover":34,"atspace-footer-navs":333,"blog-active-tags":455,"blog-active-categories":593},[4,14,18,22,26,30],{"id":5,"to":6,"icon":7,"items":8,"label":9,"target":10,"toggle":11,"command":7,"to_page":7,"visible":11,"disabled":8,"is_button":8,"separator":8,"labelAdmin":12,"align_right":8,"logged_in_only":8,"display_variant":13,"not_logged_in_only":8},"e4efaec3-54a9-4eb0-8582-4fd8770e1545","\u002Fservices",null,false,"Services","_self",true,"Internal page link","link",{"id":15,"to":16,"icon":7,"items":8,"label":17,"target":10,"toggle":11,"command":7,"to_page":7,"visible":11,"disabled":8,"is_button":8,"separator":8,"align_right":8,"logged_in_only":8,"display_variant":13,"not_logged_in_only":8},"b361671f-6584-4af5-8fa0-5a26da73684c","\u002Fpartner-with-us","Partner with us",{"id":19,"to":20,"icon":7,"items":8,"label":21,"target":10,"toggle":11,"command":7,"to_page":7,"visible":11,"disabled":8,"is_button":8,"separator":8,"align_right":8,"logged_in_only":8,"display_variant":13,"not_logged_in_only":8},"b36e0f40-bf19-4620-bab9-25d45aefb3be","\u002Fabout","About",{"id":23,"to":24,"icon":7,"items":8,"label":25,"target":10,"toggle":11,"command":7,"to_page":7,"visible":11,"disabled":8,"is_button":8,"separator":8,"align_right":8,"logged_in_only":8,"display_variant":13,"not_logged_in_only":8},"0902954c-7220-4174-a771-dd28ed1e48f1","\u002Fcontact","Contact",{"id":27,"to":28,"icon":7,"items":8,"label":29,"target":10,"toggle":11,"command":7,"to_page":7,"visible":11,"disabled":8,"is_button":8,"separator":8,"align_right":8,"logged_in_only":8,"display_variant":13,"not_logged_in_only":8},"cd688c42-d7c7-4013-a38c-64be3f793377","\u002Fknowledge-hub","Knowledge hub",{"id":31,"to":32,"icon":7,"items":8,"label":33,"target":10,"toggle":11,"command":7,"to_page":7,"visible":11,"disabled":8,"is_button":8,"separator":8,"align_right":8,"logged_in_only":8,"display_variant":13,"not_logged_in_only":8},"d2c943ff-8768-4ef9-88a5-1ae6b912733d","\u002Fcareers","Careers",{"data":35},{"id":36,"user_id":37,"slug":38,"full_url":39,"title":40,"excerpt":7,"featured_image":41,"featured_image_alt":7,"data_model":42,"publish_date":69,"is_template":8,"created_at":70,"updated_at":71,"settings":72,"seometa":73,"categories":86,"tags":94,"theme_styles":101,"page_type":7,"linked_page":7},142,7,"why-part-l-evidence-is-becoming-a-problem-for-builders-at-handover","\u002Fblog\u002Fwhy-part-l-evidence-is-becoming-a-problem-for-builders-at-handover","Why Part L Evidence Is Becoming a Problem for Builders at Handover","https:\u002F\u002Fatspace-ltd.s3.eu-west-2.amazonaws.com\u002Fuploads\u002Fblog\u002Fchatgptimagemay13202603-21-21p.jpeg",[43],{"name":44,"id":45,"componentName":46,"bgImage":7,"bgColor":7,"margin":7,"parentAlign":47,"padding":7,"classes":7,"colSpan":7,"cols":48,"colsMD":49,"originalModel":50,"borderWidth":7,"borderPosition":7,"borderColor":7,"borderRadius":7,"sticky":8,"stickyTop":68,"stickyDisableSmall":8},"Full Column Block","ff0d2e86-bf31-45e8-8da0-3a64be195e84","ColContainer","w-full","grid-cols-1","md:grid-cols-12",[51],[52,58],{"classes":53,"customColSpan":8,"id":54,"colSpan":53,"colSpanSM":55,"colSpanMD":56,"colSpanLG":57,"borderWidth":7,"borderPosition":7,"borderColor":7,"borderRadius":7},"col-span-1","3f2be0e9-62a6-4976-b3f6-5a13fccb3a06","sm:col-span-12","md:col-span-12","lg:col-span-12",{"name":59,"componentName":60,"group":61,"margin":7,"padding":7,"classes":7,"bgImage":7,"id":62,"originalModel":63},"WYSIWYG Editor","Wysiwyg","content","b5a31443-cb41-49fb-98c6-be3189ea8c8f",{"proseEnabled":11,"content":64,"lineHeightClass":65,"trackingClass":66,"spacingClass":67},"\u003Cp class=\"MsoNormal\">\u003Cstrong>Why Part L Evidence Is Becoming a Problem for Builders at Handover\u003C\u002Fstrong>\u003C\u002Fp>\n\u003Cp class=\"MsoNormal\">The houses look finished.\u003Co:p>\u003C\u002Fo:p>\u003C\u002Fp>\n\u003Cp class=\"MsoNormal\">Kitchens are in. Decorating is nearly done. Air tests are booked. The client wants dates. Everyone is pushing towards completion.\u003Co:p>\u003C\u002Fo:p>\u003C\u002Fp>\n\u003Cp class=\"MsoNormal\">Then the SAP assessor asks for evidence.\u003Co:p>\u003C\u002Fo:p>\u003C\u002Fp>\n\u003Cp class=\"MsoNormal\">Not a vague request. A proper list.\u003Co:p>\u003C\u002Fo:p>\u003C\u002Fp>\n\u003Cp class=\"MsoNormal\">Photos of insulation before it was covered. Window and door specifications. Heating plant details. Ventilation information. Air test results. Product changes. Plot specific photographic evidence. Confirmation that what was built matches the SAP assumptions.\u003Co:p>\u003C\u002Fo:p>\u003C\u002Fp>\n\u003Cp class=\"MsoNormal\">That is the moment many builders realise Part L evidence is no longer a small paperwork task at the end of the job.\u003Co:p>\u003C\u002Fo:p>\u003C\u002Fp>\n\u003Cp class=\"MsoNormal\">It is a live construction record.\u003Co:p>\u003C\u002Fo:p>\u003C\u002Fp>\n\u003Cp class=\"MsoNormal\">When that record is not organised, handover can become harder than it needs to be.\u003Co:p>\u003C\u002Fo:p>\u003C\u002Fp>\n\u003Cp class=\"MsoNormal\">Approved Document L Volume 1 gives guidance on meeting the energy efficiency requirements for dwellings, including building fabric, fixed building services, air permeability, commissioning and reporting evidence of compliance. SAP is the government method used to calculate the energy performance of homes. \u003Co:p>\u003C\u002Fo:p>\u003C\u002Fp>\n\u003Cp class=\"MsoNormal\">\u003Cb>Why Part L evidence is now a handover issue\u003Co:p>\u003C\u002Fo:p>\u003C\u002Fb>\u003C\u002Fp>\n\u003Cp class=\"MsoNormal\">Part L used to feel like something that happened mostly in the design office.\u003Co:p>\u003C\u002Fo:p>\u003C\u002Fp>\n\u003Cp class=\"MsoNormal\">The SAP calculation was done. The specification was agreed. The build moved on.\u003Co:p>\u003C\u002Fo:p>\u003C\u002Fp>\n\u003Cp class=\"MsoNormal\">Now, the gap between design and as built evidence matters more. The project team needs to show that the information used for the final SAP and BREL report reflects what has actually been installed on site.\u003Co:p>\u003C\u002Fo:p>\u003C\u002Fp>\n\u003Cp class=\"MsoNormal\">That is where handover pressure starts.\u003Co:p>\u003C\u002Fo:p>\u003C\u002Fp>\n\u003Cp class=\"MsoNormal\">By the final stage, many important details are hidden. The insulation is behind plasterboard. The floor edge is under screed. Service penetrations are boxed in. Duct routes are covered. Product labels may be inside cupboards or behind access panels.\u003Co:p>\u003C\u002Fo:p>\u003C\u002Fp>\n\u003Cp class=\"MsoNormal\">If the photographic evidence was not captured at the right time, the builder may be left trying to prove details that are no longer visible.\u003Co:p>\u003C\u002Fo:p>\u003C\u002Fp>\n\u003Cp class=\"MsoNormal\">Approved Document L says photographic evidence should be provided for each individual dwelling, taken at appropriate construction stages and before close up works. It also links this evidence with the BREL reporting process. \u003Co:p>\u003C\u002Fo:p>\u003C\u002Fp>\n\u003Cp class=\"MsoNormal\">\u003Cb>What Part L evidence actually includes\u003Co:p>\u003C\u002Fo:p>\u003C\u002Fb>\u003C\u002Fp>\n\u003Cp class=\"MsoNormal\">Part L evidence is not just one document.\u003Co:p>\u003C\u002Fo:p>\u003C\u002Fp>\n\u003Cp class=\"MsoNormal\">For new build housing, it can include:\u003Co:p>\u003C\u002Fo:p>\u003C\u002Fp>\n\u003Cp class=\"MsoNormal\">&bull; Design SAP calculations\u003Cbr>&bull; As built SAP calculations\u003Cbr>&bull; BREL report information\u003Cbr>&bull; Photographic evidence\u003Cbr>&bull; Air test results\u003Cbr>&bull; Heating and hot water product details\u003Cbr>&bull; Ventilation specifications and commissioning records\u003Cbr>&bull; Window and door U values\u003Cbr>&bull; Insulation product data\u003Cbr>&bull; Thermal bridging information\u003Cbr>&bull; PV details where included\u003Cbr>&bull; Records of design changes and substitutions\u003Co:p>\u003C\u002Fo:p>\u003C\u002Fp>\n\u003Cp class=\"MsoNormal\">The SAP assessor needs accurate information to complete the final assessment. If the information is late, unclear or inconsistent, queries are likely.\u003Co:p>\u003C\u002Fo:p>\u003C\u002Fp>\n\u003Cp class=\"MsoNormal\">That does not always mean the building is wrong. Often, the issue is that the evidence does not clearly show what has been built.\u003Co:p>\u003C\u002Fo:p>\u003C\u002Fp>\n\u003Cp class=\"MsoNormal\">\u003Cb>The common handover problem\u003Co:p>\u003C\u002Fo:p>\u003C\u002Fb>\u003C\u002Fp>\n\u003Cp class=\"MsoNormal\">A typical handover problem looks like this.\u003Co:p>\u003C\u002Fo:p>\u003C\u002Fp>\n\u003Cp class=\"MsoNormal\">The builder sends a folder of site photos to the assessor.\u003Co:p>\u003C\u002Fo:p>\u003C\u002Fp>\n\u003Cp class=\"MsoNormal\">The folder has 300 images.\u003Co:p>\u003C\u002Fo:p>\u003C\u002Fp>\n\u003Cp class=\"MsoNormal\">Some are useful. Some are duplicates. Some are screenshots from messages. Some have no plot number. Some show insulation close up, but not the location. Some show a product label, but not which plot it belongs to.\u003Co:p>\u003C\u002Fo:p>\u003C\u002Fp>\n\u003Cp class=\"MsoNormal\">The assessor then has to ask questions.\u003Co:p>\u003C\u002Fo:p>\u003C\u002Fp>\n\u003Cp class=\"MsoNormal\">Which plot is this?\u003Co:p>\u003C\u002Fo:p>\u003C\u002Fp>\n\u003Cp class=\"MsoNormal\">Was this before close up?\u003Co:p>\u003C\u002Fo:p>\u003C\u002Fp>\n\u003Cp class=\"MsoNormal\">Is this the installed product or the design product?\u003Co:p>\u003C\u002Fo:p>\u003C\u002Fp>\n\u003Cp class=\"MsoNormal\">Does this window U value match the final SAP input?\u003Co:p>\u003C\u002Fo:p>\u003C\u002Fp>\n\u003Cp class=\"MsoNormal\">Was the ventilation system commissioned?\u003Co:p>\u003C\u002Fo:p>\u003C\u002Fp>\n\u003Cp class=\"MsoNormal\">Has the air test result been issued?\u003Co:p>\u003C\u002Fo:p>\u003C\u002Fp>\n\u003Cp class=\"MsoNormal\">Has the PV layout changed?\u003Co:p>\u003C\u002Fo:p>\u003C\u002Fp>\n\u003Cp class=\"MsoNormal\">The site team then has to search phones, emails, subcontractor messages and shared folders.\u003Co:p>\u003C\u002Fo:p>\u003C\u002Fp>\n\u003Cp class=\"MsoNormal\">This is where time disappears.\u003Co:p>\u003C\u002Fo:p>\u003C\u002Fp>\n\u003Cp class=\"MsoNormal\">\u003Cb>Why builders only find out near the end\u003Co:p>\u003C\u002Fo:p>\u003C\u002Fb>\u003C\u002Fp>\n\u003Cp class=\"MsoNormal\">Part L evidence problems often stay hidden because the build looks like it is progressing well.\u003Co:p>\u003C\u002Fo:p>\u003C\u002Fp>\n\u003Cp class=\"MsoNormal\">A missing photo does not stop brickwork.\u003Co:p>\u003C\u002Fo:p>\u003C\u002Fp>\n\u003Cp class=\"MsoNormal\">An outdated SAP input does not stop plasterboarding.\u003Co:p>\u003C\u002Fo:p>\u003C\u002Fp>\n\u003Cp class=\"MsoNormal\">A product substitution does not always trigger an immediate site issue.\u003Co:p>\u003C\u002Fo:p>\u003C\u002Fp>\n\u003Cp class=\"MsoNormal\">A ventilation label that was not photographed does not stop second fix.\u003Co:p>\u003C\u002Fo:p>\u003C\u002Fp>\n\u003Cp class=\"MsoNormal\">The problem only becomes visible when someone needs to produce the final evidence pack.\u003Co:p>\u003C\u002Fo:p>\u003C\u002Fp>\n\u003Cp class=\"MsoNormal\">That is usually close to handover, when pressure is already high.\u003Co:p>\u003C\u002Fo:p>\u003C\u002Fp>\n\u003Cp class=\"MsoNormal\">This is why builders can get caught out. The physical work may be nearly complete, but the compliance evidence trail may still be incomplete.\u003Co:p>\u003C\u002Fo:p>\u003C\u002Fp>\n\u003Cp class=\"MsoNormal\">\u003Cb>The SAP calculation is only as good as the information behind it\u003Co:p>\u003C\u002Fo:p>\u003C\u002Fb>\u003C\u002Fp>\n\u003Cp class=\"MsoNormal\">SAP is a calculation method, but it relies on accurate inputs.\u003Co:p>\u003C\u002Fo:p>\u003C\u002Fp>\n\u003Cp class=\"MsoNormal\">Those inputs include fabric, services, ventilation, openings, air permeability and renewable technologies where used. GOV.UK describes SAP as the process used to calculate a home&rsquo;s energy performance. \u003Co:p>\u003C\u002Fo:p>\u003C\u002Fp>\n\u003Cp class=\"MsoNormal\">If the final build differs from the design SAP, the assessor needs to know.\u003Co:p>\u003C\u002Fo:p>\u003C\u002Fp>\n\u003Cp class=\"MsoNormal\">Common changes include:\u003Co:p>\u003C\u002Fo:p>\u003C\u002Fp>\n\u003Cp class=\"MsoNormal\">&bull; Different window or door supplier\u003Cbr>&bull; Changed U values\u003Cbr>&bull; Alternative insulation product\u003Cbr>&bull; Different heat pump or boiler model\u003Cbr>&bull; Hot water cylinder substitution\u003Cbr>&bull; Changed ventilation unit\u003Cbr>&bull; PV layout adjustment\u003Cbr>&bull; Air test result different from design target\u003Cbr>&bull; Junction detail changed on site\u003Co:p>\u003C\u002Fo:p>\u003C\u002Fp>\n\u003Cp class=\"MsoNormal\">Many of these changes are normal construction events. They only become a problem when they are not recorded and checked.\u003Co:p>\u003C\u002Fo:p>\u003C\u002Fp>\n\u003Cp class=\"MsoNormal\">\u003Cb>Why photographic evidence is causing so many issues\u003Co:p>\u003C\u002Fo:p>\u003C\u002Fb>\u003C\u002Fp>\n\u003Cp class=\"MsoNormal\">Photographic evidence sounds simple.\u003Co:p>\u003C\u002Fo:p>\u003C\u002Fp>\n\u003Cp class=\"MsoNormal\">Take photos. Save them. Send them when asked.\u003Co:p>\u003C\u002Fo:p>\u003C\u002Fp>\n\u003Cp class=\"MsoNormal\">On site, it is rarely that tidy.\u003Co:p>\u003C\u002Fo:p>\u003C\u002Fp>\n\u003Cp class=\"MsoNormal\">The main problems are:\u003Co:p>\u003C\u002Fo:p>\u003C\u002Fp>\n\u003Cp class=\"MsoNormal\">\u003Cb>Photos are taken too late\u003Co:p>\u003C\u002Fo:p>\u003C\u002Fb>\u003C\u002Fp>\n\u003Cp class=\"MsoNormal\">If the detail is already covered, the photo may not prove anything useful.\u003Co:p>\u003C\u002Fo:p>\u003C\u002Fp>\n\u003Cp class=\"MsoNormal\">\u003Cb>Photos are not plot specific\u003Co:p>\u003C\u002Fo:p>\u003C\u002Fb>\u003C\u002Fp>\n\u003Cp class=\"MsoNormal\">Evidence for one dwelling should not be assumed to cover another.\u003Co:p>\u003C\u002Fo:p>\u003C\u002Fp>\n\u003Cp class=\"MsoNormal\">\u003Cb>Photos lack context\u003Co:p>\u003C\u002Fo:p>\u003C\u002Fb>\u003C\u002Fp>\n\u003Cp class=\"MsoNormal\">A close up of insulation might show the product, but not the plot, room or junction.\u003Co:p>\u003C\u002Fo:p>\u003C\u002Fp>\n\u003Cp class=\"MsoNormal\">\u003Cb>Photos are stored in too many places\u003Co:p>\u003C\u002Fo:p>\u003C\u002Fb>\u003C\u002Fp>\n\u003Cp class=\"MsoNormal\">Phones, WhatsApp, email chains and random folders are not a reliable evidence system.\u003Co:p>\u003C\u002Fo:p>\u003C\u002Fp>\n\u003Cp class=\"MsoNormal\">\u003Cb>Photos are not linked to SAP inputs\u003Co:p>\u003C\u002Fo:p>\u003C\u002Fb>\u003C\u002Fp>\n\u003Cp class=\"MsoNormal\">A photo is more useful when it supports a specific element of the SAP or Part L record.\u003Co:p>\u003C\u002Fo:p>\u003C\u002Fp>\n\u003Cp class=\"MsoNormal\">\u003Cb>Product evidence is missing\u003Co:p>\u003C\u002Fo:p>\u003C\u002Fb>\u003C\u002Fp>\n\u003Cp class=\"MsoNormal\">Even good photos do not always confirm performance values. The assessor may still need data sheets, U values, model references and commissioning records.\u003Co:p>\u003C\u002Fo:p>\u003C\u002Fp>\n\u003Cp class=\"MsoNormal\">\u003Cb>Why handover is the worst time to fix it\u003Co:p>\u003C\u002Fo:p>\u003C\u002Fb>\u003C\u002Fp>\n\u003Cp class=\"MsoNormal\">Handover is already busy.\u003Co:p>\u003C\u002Fo:p>\u003C\u002Fp>\n\u003Cp class=\"MsoNormal\">The site team is dealing with snagging, finals, client visits, utility issues, testing, certification and last minute trade attendance.\u003Co:p>\u003C\u002Fo:p>\u003C\u002Fp>\n\u003Cp class=\"MsoNormal\">Adding a Part L evidence chase at that stage creates avoidable pressure.\u003Co:p>\u003C\u002Fo:p>\u003C\u002Fp>\n\u003Cp class=\"MsoNormal\">It can also mean the wrong people are being asked to solve the problem. The finishing manager may be chasing an insulation photo from a subcontractor who left site months ago. The contracts manager may be digging through procurement emails for a window schedule. The assessor may be waiting for confirmation before completing final outputs.\u003Co:p>\u003C\u002Fo:p>\u003C\u002Fp>\n\u003Cp class=\"MsoNormal\">None of that is a good use of time.\u003Co:p>\u003C\u002Fo:p>\u003C\u002Fp>\n\u003Cp class=\"MsoNormal\">The better approach is to treat Part L evidence as a live site process from early construction.\u003Co:p>\u003C\u002Fo:p>\u003C\u002Fp>\n\u003Cp class=\"MsoNormal\">\u003Cb>What delays can happen when evidence is missing?\u003Co:p>\u003C\u002Fo:p>\u003C\u002Fb>\u003C\u002Fp>\n\u003Cp class=\"MsoNormal\">Missing or unclear Part L evidence can lead to:\u003Co:p>\u003C\u002Fo:p>\u003C\u002Fp>\n\u003Cp class=\"MsoNormal\">&bull; More assessor queries\u003Cbr>&bull; Repeated requests for information\u003Cbr>&bull; Delays in completing final SAP outputs\u003Cbr>&bull; Delays preparing the BREL report\u003Cbr>&bull; Extra site checks\u003Cbr>&bull; Rework where details are found to be wrong\u003Cbr>&bull; Programme pressure near completion\u003Cbr>&bull; Frustration between site, office and consultants\u003Co:p>\u003C\u002Fo:p>\u003C\u002Fp>\n\u003Cp class=\"MsoNormal\">Not every missing item causes a delay. But every unclear item increases the chance of one.\u003Co:p>\u003C\u002Fo:p>\u003C\u002Fp>\n\u003Cp class=\"MsoNormal\">The risk is not only technical. It is also organisational.\u003Co:p>\u003C\u002Fo:p>\u003C\u002Fp>\n\u003Cp class=\"MsoNormal\">If evidence is spread across five people, nobody has a clear view of what is complete.\u003Co:p>\u003C\u002Fo:p>\u003C\u002Fp>\n\u003Cp class=\"MsoNormal\">\u003Cb>What should builders collect before handover?\u003Co:p>\u003C\u002Fo:p>\u003C\u002Fb>\u003C\u002Fp>\n\u003Cp class=\"MsoNormal\">Builders should start with a plot by plot evidence checklist.\u003Co:p>\u003C\u002Fo:p>\u003C\u002Fp>\n\u003Cp class=\"MsoNormal\">A good checklist should include:\u003Co:p>\u003C\u002Fo:p>\u003C\u002Fp>\n\u003Cp class=\"MsoNormal\">\u003Cb>Fabric evidence\u003Co:p>\u003C\u002Fo:p>\u003C\u002Fb>\u003C\u002Fp>\n\u003Cp class=\"MsoNormal\">&bull; Floor insulation\u003Cbr>&bull; Floor perimeter insulation\u003Cbr>&bull; External wall insulation\u003Cbr>&bull; Roof and loft insulation\u003Cbr>&bull; Insulation continuity at junctions\u003Cbr>&bull; Cavity closers\u003Cbr>&bull; Window and door reveals\u003Cbr>&bull; Thermal bridge details\u003Co:p>\u003C\u002Fo:p>\u003C\u002Fp>\n\u003Cp class=\"MsoNormal\">\u003Cb>Airtightness evidence\u003Co:p>\u003C\u002Fo:p>\u003C\u002Fb>\u003C\u002Fp>\n\u003Cp class=\"MsoNormal\">&bull; Service penetrations\u003Cbr>&bull; Duct penetrations\u003Cbr>&bull; Window perimeter sealing\u003Cbr>&bull; External door thresholds\u003Cbr>&bull; Loft hatches\u003Cbr>&bull; Meter boxes\u003Cbr>&bull; Pipe boxing\u003Cbr>&bull; Utility penetrations\u003Co:p>\u003C\u002Fo:p>\u003C\u002Fp>\n\u003Cp class=\"MsoNormal\">\u003Cb>Services evidence\u003Co:p>\u003C\u002Fo:p>\u003C\u002Fb>\u003C\u002Fp>\n\u003Cp class=\"MsoNormal\">&bull; Heating appliance labels\u003Cbr>&bull; Heat pump details where used\u003Cbr>&bull; Hot water cylinder labels\u003Cbr>&bull; Controls\u003Cbr>&bull; Pipe insulation\u003Cbr>&bull; Ventilation unit details\u003Cbr>&bull; Duct routes before boxing\u003Cbr>&bull; External terminals\u003Cbr>&bull; Commissioning records\u003Co:p>\u003C\u002Fo:p>\u003C\u002Fp>\n\u003Cp class=\"MsoNormal\">\u003Cb>Product and document evidence\u003Co:p>\u003C\u002Fo:p>\u003C\u002Fb>\u003C\u002Fp>\n\u003Cp class=\"MsoNormal\">&bull; Window and door U values\u003Cbr>&bull; Insulation data sheets\u003Cbr>&bull; Heating and hot water specifications\u003Cbr>&bull; Ventilation specifications\u003Cbr>&bull; PV data where relevant\u003Cbr>&bull; Air test results\u003Cbr>&bull; Design changes\u003Cbr>&bull; As built notes\u003Co:p>\u003C\u002Fo:p>\u003C\u002Fp>\n\u003Cp class=\"MsoNormal\">This does not mean taking photos of everything with no structure. It means collecting the right evidence at the right stage.\u003Co:p>\u003C\u002Fo:p>\u003C\u002Fp>\n\u003Cp class=\"MsoNormal\">\u003Cb>What good Part L evidence looks like\u003Co:p>\u003C\u002Fo:p>\u003C\u002Fb>\u003C\u002Fp>\n\u003Cp class=\"MsoNormal\">Good evidence is clear, traceable and organised.\u003Co:p>\u003C\u002Fo:p>\u003C\u002Fp>\n\u003Cp class=\"MsoNormal\">It should show:\u003Co:p>\u003C\u002Fo:p>\u003C\u002Fp>\n\u003Cp class=\"MsoNormal\">&bull; Which plot it relates to\u003Cbr>&bull; Which room or area it shows\u003Cbr>&bull; What detail is being recorded\u003Cbr>&bull; When it was taken\u003Cbr>&bull; Whether the detail was captured before close up\u003Cbr>&bull; Which product or specification it supports\u003Cbr>&bull; Whether any design change has occurred\u003Co:p>\u003C\u002Fo:p>\u003C\u002Fp>\n\u003Cp class=\"MsoNormal\">For photos, the best method is usually one context image and one close up image.\u003Co:p>\u003C\u002Fo:p>\u003C\u002Fp>\n\u003Cp class=\"MsoNormal\">The context photo shows where the detail is.\u003Co:p>\u003C\u002Fo:p>\u003C\u002Fp>\n\u003Cp class=\"MsoNormal\">The close up shows the technical point.\u003Co:p>\u003C\u002Fo:p>\u003C\u002Fp>\n\u003Cp class=\"MsoNormal\">Together, they are much stronger than either photo on its own.\u003Co:p>\u003C\u002Fo:p>\u003C\u002Fp>\n\u003Cp class=\"MsoNormal\">\u003Cb>How SAPAPP helps reduce handover problems\u003Co:p>\u003C\u002Fo:p>\u003C\u002Fb>\u003C\u002Fp>\n\u003Cp class=\"MsoNormal\">SAPAPP helps builders manage Part L evidence while the site is live.\u003Co:p>\u003C\u002Fo:p>\u003C\u002Fp>\n\u003Cp class=\"MsoNormal\">Instead of waiting until the SAP assessor asks for evidence near the end, SAPAPP gives the team a clear way to track what is needed.\u003Co:p>\u003C\u002Fo:p>\u003C\u002Fp>\n\u003Cp class=\"MsoNormal\">It can help organise:\u003Co:p>\u003C\u002Fo:p>\u003C\u002Fp>\n\u003Cp class=\"MsoNormal\">&bull; Plot records\u003Cbr>&bull; Photographic evidence\u003Cbr>&bull; Missing items\u003Cbr>&bull; Product data\u003Cbr>&bull; SAP related changes\u003Cbr>&bull; Air test preparation records\u003Cbr>&bull; Ventilation evidence\u003Cbr>&bull; Final evidence pack structure\u003Co:p>\u003C\u002Fo:p>\u003C\u002Fp>\n\u003Cp class=\"MsoNormal\">This gives the site manager a live view of the evidence position.\u003Co:p>\u003C\u002Fo:p>\u003C\u002Fp>\n\u003Cp class=\"MsoNormal\">It also helps the contracts manager and assessor see what is complete and what still needs action.\u003Co:p>\u003C\u002Fo:p>\u003C\u002Fp>\n\u003Cp class=\"MsoNormal\">The aim is not more admin. The aim is fewer last minute surprises.\u003Co:p>\u003C\u002Fo:p>\u003C\u002Fp>\n\u003Cp class=\"MsoNormal\">\u003Cb>What information ATSPACE needs from builders\u003Co:p>\u003C\u002Fo:p>\u003C\u002Fb>\u003C\u002Fp>\n\u003Cp class=\"MsoNormal\">To support Part L evidence before handover, ATSPACE usually asks for:\u003Co:p>\u003C\u002Fo:p>\u003C\u002Fp>\n\u003Cp class=\"MsoNormal\">&bull; Latest drawings\u003Cbr>&bull; Design SAP information\u003Cbr>&bull; Plot schedule\u003Cbr>&bull; Construction programme\u003Cbr>&bull; Specification documents\u003Cbr>&bull; Window and door schedules\u003Cbr>&bull; Heating and hot water details\u003Cbr>&bull; Ventilation strategy\u003Cbr>&bull; PV information where relevant\u003Cbr>&bull; Air test targets\u003Cbr>&bull; Existing site photos\u003Cbr>&bull; Known product substitutions\u003Co:p>\u003C\u002Fo:p>\u003C\u002Fp>\n\u003Cp class=\"MsoNormal\">If the project is already near handover, it is still worth starting. The first step is to find out what evidence exists, what is missing and what can still be captured.\u003Co:p>\u003C\u002Fo:p>\u003C\u002Fp>\n\u003Cp class=\"MsoNormal\">\u003Cb>Step by step process\u003Co:p>\u003C\u002Fo:p>\u003C\u002Fb>\u003C\u002Fp>\n\u003Cp class=\"MsoNormal\">\u003Cb>Step 1: Review the SAP assumptions\u003Co:p>\u003C\u002Fo:p>\u003C\u002Fb>\u003C\u002Fp>\n\u003Cp class=\"MsoNormal\">We check what the SAP assessment is based on and identify the evidence needed to support it.\u003Co:p>\u003C\u002Fo:p>\u003C\u002Fp>\n\u003Cp class=\"MsoNormal\">\u003Cb>Step 2: Set up a plot by plot tracker\u003Co:p>\u003C\u002Fo:p>\u003C\u002Fb>\u003C\u002Fp>\n\u003Cp class=\"MsoNormal\">Each dwelling is listed separately, with evidence items assigned by detail type and stage.\u003Co:p>\u003C\u002Fo:p>\u003C\u002Fp>\n\u003Cp class=\"MsoNormal\">\u003Cb>Step 3: Audit existing evidence\u003Co:p>\u003C\u002Fo:p>\u003C\u002Fb>\u003C\u002Fp>\n\u003Cp class=\"MsoNormal\">We review photos, product data and records already available.\u003Co:p>\u003C\u002Fo:p>\u003C\u002Fp>\n\u003Cp class=\"MsoNormal\">\u003Cb>Step 4: Identify gaps\u003Co:p>\u003C\u002Fo:p>\u003C\u002Fb>\u003C\u002Fp>\n\u003Cp class=\"MsoNormal\">Missing or weak evidence is flagged clearly so the site team knows what to capture.\u003Co:p>\u003C\u002Fo:p>\u003C\u002Fp>\n\u003Cp class=\"MsoNormal\">\u003Cb>Step 5: Prioritise details at risk\u003Co:p>\u003C\u002Fo:p>\u003C\u002Fb>\u003C\u002Fp>\n\u003Cp class=\"MsoNormal\">Anything about to be covered is treated as urgent.\u003Co:p>\u003C\u002Fo:p>\u003C\u002Fp>\n\u003Cp class=\"MsoNormal\">\u003Cb>Step 6: Align product changes with SAP\u003Co:p>\u003C\u002Fo:p>\u003C\u002Fb>\u003C\u002Fp>\n\u003Cp class=\"MsoNormal\">Substitutions are recorded and checked against the final SAP information.\u003Co:p>\u003C\u002Fo:p>\u003C\u002Fp>\n\u003Cp class=\"MsoNormal\">\u003Cb>Step 7: Build the final evidence pack\u003Co:p>\u003C\u002Fo:p>\u003C\u002Fb>\u003C\u002Fp>\n\u003Cp class=\"MsoNormal\">Evidence is organised so it can be reviewed more easily by the project team and assessor.\u003Co:p>\u003C\u002Fo:p>\u003C\u002Fp>\n\u003Cp class=\"MsoNormal\">\u003Cb>Typical pitfalls and how to avoid them\u003Co:p>\u003C\u002Fo:p>\u003C\u002Fb>\u003C\u002Fp>\n\u003Cp class=\"MsoNormal\">\u003Cb>Waiting for the assessor to ask\u003Co:p>\u003C\u002Fo:p>\u003C\u002Fb>\u003C\u002Fp>\n\u003Cp class=\"MsoNormal\">Do not wait until final SAP review. Start collecting evidence during construction.\u003Co:p>\u003C\u002Fo:p>\u003C\u002Fp>\n\u003Cp class=\"MsoNormal\">\u003Cb>Treating all plots as the same\u003Co:p>\u003C\u002Fo:p>\u003C\u002Fb>\u003C\u002Fp>\n\u003Cp class=\"MsoNormal\">Repeated house types still need individual dwelling evidence.\u003Co:p>\u003C\u002Fo:p>\u003C\u002Fp>\n\u003Cp class=\"MsoNormal\">\u003Cb>Taking photos without context\u003Co:p>\u003C\u002Fo:p>\u003C\u002Fb>\u003C\u002Fp>\n\u003Cp class=\"MsoNormal\">Always show the plot, room and detail clearly.\u003Co:p>\u003C\u002Fo:p>\u003C\u002Fp>\n\u003Cp class=\"MsoNormal\">\u003Cb>Forgetting services\u003Co:p>\u003C\u002Fo:p>\u003C\u002Fb>\u003C\u002Fp>\n\u003Cp class=\"MsoNormal\">Part L evidence is not only fabric. Heating, hot water, ventilation and PV also matter.\u003Co:p>\u003C\u002Fo:p>\u003C\u002Fp>\n\u003Cp class=\"MsoNormal\">\u003Cb>Not recording substitutions\u003Co:p>\u003C\u002Fo:p>\u003C\u002Fb>\u003C\u002Fp>\n\u003Cp class=\"MsoNormal\">A product change should trigger an evidence and SAP check.\u003Co:p>\u003C\u002Fo:p>\u003C\u002Fp>\n\u003Cp class=\"MsoNormal\">\u003Cb>Leaving photos on phones\u003Co:p>\u003C\u002Fo:p>\u003C\u002Fb>\u003C\u002Fp>\n\u003Cp class=\"MsoNormal\">Use a shared system that the project team can access.\u003Co:p>\u003C\u002Fo:p>\u003C\u002Fp>\n\u003Cp class=\"MsoNormal\">\u003Cb>Timescales and what can delay it\u003Co:p>\u003C\u002Fo:p>\u003C\u002Fb>\u003C\u002Fp>\n\u003Cp class=\"MsoNormal\">For a small housing scheme, a basic evidence review can often be started quickly once drawings, SAP information and site photos are available.\u003Co:p>\u003C\u002Fo:p>\u003C\u002Fp>\n\u003Cp class=\"MsoNormal\">The work may take longer when:\u003Co:p>\u003C\u002Fo:p>\u003C\u002Fp>\n\u003Cp class=\"MsoNormal\">&bull; Photos are not labelled\u003Cbr>&bull; Plot records are mixed together\u003Cbr>&bull; Product data is missing\u003Cbr>&bull; Several substitutions have happened\u003Cbr>&bull; Details are already covered\u003Cbr>&bull; Air test results are not available\u003Cbr>&bull; Ventilation commissioning is incomplete\u003Cbr>&bull; The site team is close to completion and stretched\u003Co:p>\u003C\u002Fo:p>\u003C\u002Fp>\n\u003Cp class=\"MsoNormal\">The earlier the process starts, the easier it is to manage.\u003Co:p>\u003C\u002Fo:p>\u003C\u002Fp>\n\u003Cp class=\"MsoNormal\">\u003Cb>What builders receive at the end\u003Co:p>\u003C\u002Fo:p>\u003C\u002Fb>\u003C\u002Fp>\n\u003Cp class=\"MsoNormal\">Builders can receive:\u003Co:p>\u003C\u002Fo:p>\u003C\u002Fp>\n\u003Cp class=\"MsoNormal\">&bull; Part L evidence gap review\u003Cbr>&bull; Plot by plot evidence tracker\u003Cbr>&bull; Photographic evidence audit\u003Cbr>&bull; Missing information schedule\u003Cbr>&bull; SAP change log\u003Cbr>&bull; Product evidence checklist\u003Cbr>&bull; Air test preparation notes\u003Cbr>&bull; Final organised evidence pack\u003Co:p>\u003C\u002Fo:p>\u003C\u002Fp>\n\u003Cp class=\"MsoNormal\">The deliverables are designed to help real project teams, not just sit in a folder.\u003Co:p>\u003C\u002Fo:p>\u003C\u002Fp>\n\u003Cp class=\"MsoNormal\">\u003Cb>Why ATSPACE\u003Co:p>\u003C\u002Fo:p>\u003C\u002Fb>\u003C\u002Fp>\n\u003Cp class=\"MsoNormal\">ATSPACE understands the pressure builders face at handover.\u003Co:p>\u003C\u002Fo:p>\u003C\u002Fp>\n\u003Cp class=\"MsoNormal\">We know the issue is rarely that nobody cares about compliance. The issue is that evidence gets lost while the site is moving.\u003Co:p>\u003C\u002Fo:p>\u003C\u002Fp>\n\u003Cp class=\"MsoNormal\">Our role is to make the process clearer.\u003Co:p>\u003C\u002Fo:p>\u003C\u002Fp>\n\u003Cp class=\"MsoNormal\">We help builders connect the design SAP, site photos, product evidence and as built information into one practical evidence trail.\u003Co:p>\u003C\u002Fo:p>\u003C\u002Fp>\n\u003Cp class=\"MsoNormal\">We do not guarantee building control approval or any specific outcome. We provide clear, evidence led support that helps reduce avoidable handover risk.\u003Co:p>\u003C\u002Fo:p>\u003C\u002Fp>\n\u003Cp class=\"MsoNormal\">\u003Cb>FAQ\u003Co:p>\u003C\u002Fo:p>\u003C\u002Fb>\u003C\u002Fp>\n\u003Cp class=\"MsoNormal\">\u003Cb>Why is Part L evidence becoming a bigger issue at handover?\u003Co:p>\u003C\u002Fo:p>\u003C\u002Fb>\u003C\u002Fp>\n\u003Cp class=\"MsoNormal\">Because final SAP and BREL information needs to reflect the as built home, not just the design intent. If photographic evidence, product data or change records are missing, the final review can become harder.\u003Co:p>\u003C\u002Fo:p>\u003C\u002Fp>\n\u003Cp class=\"MsoNormal\">\u003Cb>What is the BREL report?\u003Co:p>\u003C\u002Fo:p>\u003C\u002Fb>\u003C\u002Fp>\n\u003Cp class=\"MsoNormal\">The BREL report is the Building Regulations England Part L report. It supports the Part L compliance process for new dwellings and is linked to SAP information and evidence records.\u003Co:p>\u003C\u002Fo:p>\u003C\u002Fp>\n\u003Cp class=\"MsoNormal\">\u003Cb>Does the SAP assessor need photographic evidence?\u003Co:p>\u003C\u002Fo:p>\u003C\u002Fb>\u003C\u002Fp>\n\u003Cp class=\"MsoNormal\">Approved Document L says photographic evidence should be made available to the energy assessor and the building control body. \u003Co:p>\u003C\u002Fo:p>\u003C\u002Fp>\n\u003Cp class=\"MsoNormal\">\u003Cb>What are the most common Part L evidence problems?\u003Co:p>\u003C\u002Fo:p>\u003C\u002Fb>\u003C\u002Fp>\n\u003Cp class=\"MsoNormal\">The most common issues are missing photos, unclear plot references, product substitutions, outdated SAP assumptions, missing ventilation records and evidence being stored in too many places.\u003Co:p>\u003C\u002Fo:p>\u003C\u002Fp>\n\u003Cp class=\"MsoNormal\">\u003Cb>Can Part L evidence be collected at the end of the job?\u003Co:p>\u003C\u002Fo:p>\u003C\u002Fb>\u003C\u002Fp>\n\u003Cp class=\"MsoNormal\">Some evidence can be collected at the end, such as product labels, commissioning records and air test results. However, hidden details such as insulation and junctions should be photographed before close up works.\u003Co:p>\u003C\u002Fo:p>\u003C\u002Fp>\n\u003Cp class=\"MsoNormal\">\u003Cb>Does missing evidence mean the building fails Part L?\u003Co:p>\u003C\u002Fo:p>\u003C\u002Fb>\u003C\u002Fp>\n\u003Cp class=\"MsoNormal\">Not automatically. Missing evidence creates uncertainty and may lead to further questions or checks. The outcome depends on the project and the information available.\u003Co:p>\u003C\u002Fo:p>\u003C\u002Fp>\n\u003Cp class=\"MsoNormal\">\u003Cb>How does SAPAPP help builders?\u003Co:p>\u003C\u002Fo:p>\u003C\u002Fb>\u003C\u002Fp>\n\u003Cp class=\"MsoNormal\">SAPAPP helps organise Part L evidence by plot, detail and status. It gives the team a clearer view of missing items and helps reduce last minute evidence chasing.\u003Co:p>\u003C\u002Fo:p>\u003C\u002Fp>\n\u003Cp class=\"MsoNormal\">\u003Cb>Does ATSPACE guarantee Part L compliance?\u003Co:p>\u003C\u002Fo:p>\u003C\u002Fb>\u003C\u002Fp>\n\u003Cp class=\"MsoNormal\">No. ATSPACE does not guarantee compliance, approval or building control acceptance. We provide technical support, evidence review and practical coordination to help reduce avoidable risk.\u003Co:p>\u003C\u002Fo:p>\u003C\u002Fp>\n\u003Cp class=\"MsoNormal\">\u003Cb>Call to action\u003Co:p>\u003C\u002Fo:p>\u003C\u002Fb>\u003C\u002Fp>\n\u003Cp class=\"MsoNormal\">Do not wait for the SAP assessor to ask for evidence in the final week.\u003Co:p>\u003C\u002Fo:p>\u003C\u002Fp>\n\u003Cp class=\"MsoNormal\">If your project is heading towards handover, ATSPACE can help you review what you have, identify what is missing and organise your Part L evidence through SAPAPP.\u003Co:p>\u003C\u002Fo:p>\u003C\u002Fp>\n\u003Cp class=\"MsoNormal\">Speak to ATSPACE early and give your site team a clearer route to completion.\u003Co:p>\u003C\u002Fo:p>\u003C\u002Fp>\n\u003Cp class=\"MsoNormal\">4 SEO extras\u003Co:p>\u003C\u002Fo:p>\u003C\u002Fp>\n\u003Cp class=\"MsoNormal\">4.1 Suggested URL slug\u003Co:p>\u003C\u002Fo:p>\u003C\u002Fp>\n\u003Cp class=\"MsoNormal\">why part l evidence is a problem for builders at handover\u003Co:p>\u003C\u002Fo:p>\u003C\u002Fp>\n\u003Cp class=\"MsoNormal\">4.2 Image alt text\u003Co:p>\u003C\u002Fo:p>\u003C\u002Fp>\n\u003Cp class=\"MsoNormal\">Site manager tablet showing Part L evidence gaps, SAP calculations and new build handover compliance checklist\u003Co:p>\u003C\u002Fo:p>\u003C\u002Fp>\n\u003Cp class=\"MsoNormal\">4.3 5 suggested tags\u003Co:p>\u003C\u002Fo:p>\u003C\u002Fp>\n\u003Cp class=\"MsoNormal\">Part L evidence\u003Cbr>New build handover compliance\u003Cbr>SAP calculations\u003Cbr>Part L compliance problems\u003Cbr>SAPAPP\u003Co:p>\u003C\u002Fo:p>\u003C\u002Fp>\n\u003Cp class=\"MsoNormal\">4.4 3 to 5 key takeaways\u003Co:p>\u003C\u002Fo:p>\u003C\u002Fp>\n\u003Cp class=\"MsoNormal\">&bull; Part L evidence problems often appear late because key details are already hidden.\u003Cbr>&bull; SAP calculations need accurate as built information, not just design assumptions.\u003Cbr>&bull; Missing photos, product data and change records can slow final review.\u003Cbr>&bull; Builders should collect evidence by plot throughout construction.\u003Cbr>&bull; SAPAPP helps organise Part L records before handover pressure builds.\u003Co:p>\u003C\u002Fo:p>\u003C\u002Fp>\n\u003Cp class=\"MsoNormal\">5 Image generation\u003Co:p>\u003C\u002Fo:p>\u003C\u002Fp>\n\u003Cp class=\"MsoNormal\">Image prompt used:\u003Co:p>\u003C\u002Fo:p>\u003C\u002Fp>\n\u003Cp class=\"MsoNormal\">Clean modern technical blog thumbnail for ATSPACE and SAPAPP partnership. Generic UK new build housing handover scene shown as a neat construction drawing background with a tablet in the foreground displaying Part L evidence gaps, SAP calculation status, BREL report checklist and plot folders. Include subtle warning markers for missing photos, green ticks for completed evidence, airflow arrows, insulation layer details, window reveal lines, heating and ventilation icons. Professional teal, blue, green and white colour palette with a small yellow accent. No people, no real address, no clutter, no cartoon style. Trustworthy construction compliance design for a UK building performance company.\u003Co:p>\u003C\u002Fo:p>\u003C\u002Fp>","leading-relaxed","tracking-normal","[&_p]:my-0 [&_p+p]:mt-4",0,"14-05-2026","2026-05-14T10:22:01.000000Z","2026-05-14T10:26:44.000000Z",{"hide_featured_image_on_page":8},{"id":74,"meta_title":40,"meta_description":75,"seoable_id":36,"seoable_type":76,"keyword_focus":75,"search_intent":7,"cornerstone_content":8,"canonical_url":77,"meta_robots":78,"og_title":40,"og_description":7,"og_image":79,"og_type":80,"og_url":7,"twitter_card":81,"twitter_title":40,"twitter_description":7,"twitter_image":79,"schema_markup":7,"extra_meta":7,"ai_field_locks":82,"insights":7,"serp_insights":7,"hreflang_alternates":7,"json_ld":7,"sitemap_changefreq":83,"sitemap_priority":84,"created_at":70,"updated_at":85},340,"","Kabaddle\\BlogModule\\Models\\Post","https:\u002F\u002Fatspaceltd.co.uk\u002Fblog\u002Fwhy-part-l-evidence-is-becoming-a-problem-for-builders-at-handover","index,follow","https:\u002F\u002Fatspace-ltd.s3.eu-west-2.amazonaws.com\u002Fuploads\u002Fsite-image.png","website","summary",{"og_url":8,"og_type":8,"og_image":8,"og_title":8,"extra_meta":8,"meta_title":8,"meta_robots":8,"twitter_card":8,"canonical_url":8,"keyword_focus":8,"schema_markup":8,"twitter_image":8,"twitter_title":8,"og_description":8,"meta_description":8,"twitter_description":8},"monthly","0.5","2026-05-27T22:29:13.000000Z",[87],{"id":88,"parent_id":7,"slug":89,"title":90,"created_at":91,"updated_at":92,"label":90,"pivot":93},1,"uncategorised","Uncategorised","2026-01-27T17:10:22.000000Z","2026-01-27T17:10:33.000000Z",{"post_id":36,"category_id":88},[95],{"id":96,"slug":97,"title":98,"created_at":99,"updated_at":99,"pivot":100},34,"sapapp","SAPAPP","2026-05-14T10:15:59.000000Z",{"post_id":36,"tag_id":96},{"version":102,"wrapper_attribute":103,"stylesheet_url":104,"layout_classes":105,"head_links":106,"wysiwyg_default_class_presets":115,"wysiwyg_class_presets":287,"wysiwyg_default_color_presets":307,"wysiwyg_color_presets":332},"1781598099-13ddca9f","data-site-theme-wrapper","https:\u002F\u002Fportal.atspaceltd.co.uk\u002Ftheme\u002Fsite.css","min-h-screen transition-colors duration-500 bg-[#f7f8fc] text-slate-900 bg-white",[107,110,112],{"rel":108,"href":109},"preconnect","https:\u002F\u002Ffonts.googleapis.com",{"rel":108,"href":111},"https:\u002F\u002Ffonts.gstatic.com",{"rel":113,"href":114},"stylesheet","https:\u002F\u002Ffonts.googleapis.com\u002Fcss2?family=Inter:ital,opsz,wght@0,14..32,100..900;1,14..32,100..900&family=Roboto:ital,wght@0,100..900;1,100..900&display=swap",{"image":116,"text_size":131,"text_style":152,"line_height":173,"tracking":190,"spacing":210,"general":227},[117,119,122,125,128],{"label":118,"value":75},"Default (no extra classes)",{"label":120,"value":121},"Responsive – natural width","max-w-full h-auto",{"label":123,"value":124},"Responsive – full width","w-full h-auto",{"label":126,"value":127},"Rounded responsive","max-w-full h-auto rounded-lg",{"label":129,"value":130},"Shadowed responsive","max-w-full h-auto rounded-lg shadow-lg",[132,134,137,140,143,146,149],{"label":133,"value":75},"No size class",{"label":135,"value":136},"Heading XL (H1)","mt-0 pb-4 text-4xl md:text-5xl font-bold leading-tight",{"label":138,"value":139},"Heading Large (H2)","mt-0 pb-3 text-3xl md:text-4xl font-bold leading-tight",{"label":141,"value":142},"Heading Medium (H3)","mt-0 pb-3 text-2xl md:text-3xl font-semibold leading-snug",{"label":144,"value":145},"Paragraph Large","mt-0 pb-4 text-lg leading-relaxed",{"label":147,"value":148},"Paragraph Default","mt-0 pb-3 text-base leading-7",{"label":150,"value":151},"Paragraph Small","mt-0 pb-2 text-sm leading-6 text-slate-600",[153,155,158,161,164,167,170],{"label":154,"value":75},"No text style class",{"label":156,"value":157},"Page Title Style","mt-0 font-extrabold text-4xl md:text-5xl text-theme-dark-green leading-[1.2em]",{"label":159,"value":160},"Highlighter Mark","highlight-mark",{"label":162,"value":163},"Lead paragraph","lead",{"label":165,"value":166},"Small muted text","text-sm text-gray-500",{"label":168,"value":169},"Highlighted text","font-semibold text-emerald-700",{"label":171,"value":172},"Uppercase eyebrow","uppercase tracking-wide text-xs font-semibold text-slate-500",[174,176,179,182,185,187],{"label":175,"value":75},"No line-height class",{"label":177,"value":178},"Tight line height","leading-tight",{"label":180,"value":181},"Snug line height","leading-snug",{"label":183,"value":184},"Normal line height","leading-normal",{"label":186,"value":65},"Relaxed line height",{"label":188,"value":189},"Loose line height","leading-loose",[191,193,196,199,201,204,207],{"label":192,"value":75},"No tracking class",{"label":194,"value":195},"Tracking tighter","tracking-tighter",{"label":197,"value":198},"Tracking tight","tracking-tight",{"label":200,"value":66},"Tracking normal",{"label":202,"value":203},"Tracking wide","tracking-wide",{"label":205,"value":206},"Tracking wider","tracking-wider",{"label":208,"value":209},"Tracking widest","tracking-widest",[211,213,216,218,221,224],{"label":212,"value":75},"No spacing class",{"label":214,"value":215},"Paragraph spacing – tight","[&_p]:my-0 [&_p+p]:mt-2",{"label":217,"value":67},"Paragraph spacing – default",{"label":219,"value":220},"Paragraph spacing – comfortable","[&_p]:my-0 [&_p+p]:mt-6",{"label":222,"value":223},"Heading + paragraph rhythm","[&_h1]:mb-4 [&_h2]:mb-3 [&_h3]:mb-3 [&_h4]:mb-2 [&_p]:my-0 [&_p+p]:mt-4",{"label":225,"value":226},"Lists rhythm","[&_ul]:my-3 [&_ol]:my-3 [&_li+li]:mt-1",[228,230,233,236,239,242,245,248,251,254,257,260,263,266,269,272,275,278,281,284],{"label":229,"value":75},"No class",{"label":231,"value":232},"Opacity 100%","opacity-100",{"label":234,"value":235},"Opacity 90%","opacity-90",{"label":237,"value":238},"Opacity 75%","opacity-75",{"label":240,"value":241},"Opacity 50%","opacity-50",{"label":243,"value":244},"Opacity 30%","opacity-30",{"label":246,"value":247},"Margin bottom none","mb-0",{"label":249,"value":250},"Margin bottom small","mb-2",{"label":252,"value":253},"Margin bottom medium","mb-4",{"label":255,"value":256},"Margin bottom large","mb-6",{"label":258,"value":259},"Section title","section-title",{"label":261,"value":262},"Block quote","border-l-4 border-slate-300 pl-4 italic text-slate-700",{"label":264,"value":265},"Pull quote","my-6 rounded-xl border border-slate-200 bg-slate-50 p-6 text-xl leading-relaxed text-slate-800",{"label":267,"value":268},"Info callout","rounded-lg border border-sky-200 bg-sky-50 p-4 text-sky-900",{"label":270,"value":271},"Muted panel","rounded-lg bg-slate-100 p-4 text-slate-700",{"label":273,"value":274},"Lists: inherit text + marker colour","[&_ul]:text-inherit [&_ol]:text-inherit [&_li]:text-inherit [&_li::marker]:text-current",{"label":276,"value":277},"Lists: no indent","[&_ul]:pl-0 [&_ol]:pl-0 [&_ul]:ml-0 [&_ol]:ml-0",{"label":279,"value":280},"Lists: no indent (inside markers)","[&_ul]:pl-0 [&_ol]:pl-0 [&_ul]:ml-0 [&_ol]:ml-0 [&_ul]:list-inside [&_ol]:list-inside",{"label":282,"value":283},"Key facts list","list-disc space-y-2 pl-6 marker:text-slate-500",{"label":285,"value":286},"Code inline","rounded bg-slate-100 px-1.5 py-0.5 font-mono text-[0.9em] text-slate-800",{"image":288,"text_size":289,"text_style":290,"line_height":303,"tracking":304,"spacing":305,"general":306},[],[],[291,294,297,300],{"label":292,"value":293},"Default (inherit)","None",{"label":295,"value":296},"Sans serif","font-sans",{"label":298,"value":299},"Serfi","font-serif",{"label":301,"value":302},"Monospace","font-mono",[],[],[],[],[308,311,314,317,320,323,326,329],{"label":309,"value":310},"Body text","#1F2937",{"label":312,"value":313},"Muted text","#6B7280",{"label":315,"value":316},"Heading dark","#111827",{"label":318,"value":319},"Primary brand","#0284C7",{"label":321,"value":322},"Success","#059669",{"label":324,"value":325},"Warning","#D97706",{"label":327,"value":328},"Danger","#DC2626",{"label":330,"value":331},"White","#FFFFFF",[],[334,349,382,395,432,441],[335,337,339,341,343,345],{"id":336,"to":16,"icon":7,"items":8,"label":17,"target":10,"toggle":8,"command":7,"to_page":7,"visible":11,"disabled":8,"is_button":8,"separator":8,"align_right":8,"logged_in_only":8,"display_variant":13,"not_logged_in_only":8},"7bc32343-19dd-4628-9f6f-d81dd41680a2",{"id":338,"to":20,"icon":7,"items":8,"label":21,"target":10,"toggle":8,"command":7,"to_page":7,"visible":11,"disabled":8,"is_button":8,"separator":8,"align_right":8,"logged_in_only":8,"display_variant":13,"not_logged_in_only":8},"61f29609-258e-4a1b-a81e-293d1039a1c4",{"id":340,"to":28,"icon":7,"items":8,"label":29,"target":10,"toggle":8,"command":7,"to_page":7,"visible":11,"disabled":8,"is_button":8,"separator":8,"align_right":8,"logged_in_only":8,"display_variant":13,"not_logged_in_only":8},"fb09cc92-9921-49bf-98ff-4b985b8c9baa",{"id":342,"to":24,"icon":7,"items":8,"label":25,"target":10,"toggle":8,"command":7,"to_page":7,"visible":11,"disabled":8,"is_button":8,"separator":8,"align_right":8,"logged_in_only":8,"display_variant":13,"not_logged_in_only":8},"b8b03433-8a13-485f-a874-4fe30a715494",{"id":344,"to":32,"icon":7,"items":8,"label":33,"target":10,"toggle":8,"command":7,"to_page":7,"visible":11,"disabled":8,"is_button":8,"separator":8,"align_right":8,"logged_in_only":8,"display_variant":13,"not_logged_in_only":8},"ea8625f5-96a7-4a86-b573-f25f299c6f08",{"id":346,"to":347,"icon":7,"items":8,"label":348,"target":10,"toggle":8,"command":7,"to_page":7,"visible":11,"disabled":8,"is_button":8,"separator":8,"align_right":8,"logged_in_only":8,"display_variant":13,"not_logged_in_only":8},"38a1e249-95df-4ddf-a862-691fd0e7a25f","\u002Fblog","Blog",[350,354,358,362,366,370,374,378],{"id":351,"to":352,"icon":7,"items":8,"label":353,"target":10,"toggle":8,"command":7,"to_page":7,"visible":11,"disabled":8,"is_button":8,"separator":8,"align_right":8,"logged_in_only":8,"display_variant":13,"not_logged_in_only":8},"ec519beb-33dd-4275-aa89-4b9acec78626","\u002Fservices\u002Fenergy-statements","Energy Statements",{"id":355,"to":356,"icon":7,"items":8,"label":357,"target":10,"toggle":8,"command":7,"to_page":7,"visible":11,"disabled":8,"is_button":8,"separator":8,"align_right":8,"logged_in_only":8,"display_variant":13,"not_logged_in_only":8},"a5bb7874-1b6a-430c-86d0-72b6ac222385","\u002Fservices\u002Fsap-calculations","SAP Calculations",{"id":359,"to":360,"icon":7,"items":8,"label":361,"target":10,"toggle":8,"command":7,"to_page":7,"visible":11,"disabled":8,"is_button":8,"separator":8,"align_right":8,"logged_in_only":8,"display_variant":13,"not_logged_in_only":8},"af14dfcd-3544-4a60-b6c0-dee218e214dd","\u002Fservices\u002Fsbem-calculations","SBEM Calculations",{"id":363,"to":364,"icon":7,"items":8,"label":365,"target":10,"toggle":8,"command":7,"to_page":7,"visible":11,"disabled":8,"is_button":8,"separator":8,"align_right":8,"logged_in_only":8,"display_variant":13,"not_logged_in_only":8},"0901f274-10a6-4d01-a09d-1b7e1db0d581","\u002Fservices\u002Fwater-efficiency-calculations","Water Efficiency Calculations",{"id":367,"to":368,"icon":7,"items":8,"label":369,"target":10,"toggle":8,"command":7,"to_page":7,"visible":11,"disabled":8,"is_button":8,"separator":8,"align_right":8,"logged_in_only":8,"display_variant":13,"not_logged_in_only":8},"512ca44b-ff3d-4a4e-b268-0dd1e8ac7122","\u002Fservices\u002Foverheating-assessments","Overheating Assessments",{"id":371,"to":372,"icon":7,"items":8,"label":373,"target":10,"toggle":8,"command":7,"to_page":7,"visible":11,"disabled":8,"is_button":8,"separator":8,"align_right":8,"logged_in_only":8,"display_variant":13,"not_logged_in_only":8},"8e33dd61-9f98-47db-8913-58a58b8431f2","\u002Fservices\u002Foverglazed-extension-calculations","Overglazed Extension Calculations",{"id":375,"to":376,"icon":7,"items":8,"label":377,"target":10,"toggle":8,"command":7,"to_page":7,"visible":11,"disabled":8,"is_button":8,"separator":8,"align_right":8,"logged_in_only":8,"display_variant":13,"not_logged_in_only":8},"56cbf8f1-560c-46ea-82dd-d2bc75350076","\u002Fservices\u002Fu-value-calculations","U-value Calculations",{"id":379,"to":380,"icon":7,"items":8,"label":381,"target":10,"toggle":8,"command":7,"to_page":7,"visible":11,"disabled":8,"is_button":8,"separator":8,"align_right":8,"logged_in_only":8,"display_variant":13,"not_logged_in_only":8},"2e407cc6-56cf-43f3-9584-3541adeff365","\u002Fservices\u002Fpsi-values","PSI Values",[383,387,391],{"id":384,"to":385,"icon":7,"items":8,"label":386,"target":10,"toggle":11,"command":7,"to_page":7,"visible":11,"disabled":8,"is_button":8,"separator":8,"align_right":8,"logged_in_only":8,"display_variant":13,"not_logged_in_only":8},"50e1c2d4-9067-4eee-81e2-40de42f9443b","\u002Fservices\u002Fdiagnostic-air-leakage-testing","Diagnostic Air Leakage Testing",{"id":388,"to":389,"icon":7,"items":8,"label":390,"target":10,"toggle":11,"command":7,"to_page":7,"visible":11,"disabled":8,"is_button":8,"separator":8,"align_right":8,"logged_in_only":8,"display_variant":13,"not_logged_in_only":8},"21279013-e0f2-4bd2-8f0d-8359f14af74e","\u002Fservices\u002Fpre-improvement-sound-insulation-testing","Pre-improvement Sound Insulation Testing",{"id":392,"to":393,"icon":7,"items":8,"label":394,"target":10,"toggle":11,"command":7,"to_page":7,"visible":11,"disabled":8,"is_button":8,"separator":8,"align_right":8,"logged_in_only":8,"display_variant":13,"not_logged_in_only":8},"f28856d9-bd52-4d8f-8934-c20a2df6f2a0","\u002Fservices\u002Fair-leakage-on-site-design-advice","Air Leakage On-site Design Advice",[396,400,404,408,412,416,420,424,428],{"id":397,"to":398,"icon":7,"items":8,"label":399,"target":10,"toggle":11,"command":7,"to_page":7,"visible":11,"disabled":8,"is_button":8,"separator":8,"align_right":8,"logged_in_only":8,"display_variant":13,"not_logged_in_only":8},"f9d3a9e3-e414-47e7-bb96-e2fb0c539231","\u002Fservices\u002Fresidential-air-leakage-testing","Residential Air Leakage Testing",{"id":401,"to":402,"icon":7,"items":8,"label":403,"target":10,"toggle":11,"command":7,"to_page":7,"visible":11,"disabled":8,"is_button":8,"separator":8,"align_right":8,"logged_in_only":8,"display_variant":13,"not_logged_in_only":8},"64a87166-10a8-42f9-99f3-dd8ad1a01c21","\u002Fservices\u002Fcommercial-air-leakage-testing","Commercial Air Leakage Testing",{"id":405,"to":406,"icon":7,"items":8,"label":407,"target":10,"toggle":11,"command":7,"to_page":7,"visible":11,"disabled":8,"is_button":8,"separator":8,"align_right":8,"logged_in_only":8,"display_variant":13,"not_logged_in_only":8},"e4399df9-c703-4daf-af96-511f4b932a56","\u002Fservices\u002Fsmoke-shaft-air-leakage-testing","Smoke Shaft Air Leakage Testing",{"id":409,"to":410,"icon":7,"items":8,"label":411,"target":10,"toggle":11,"command":7,"to_page":7,"visible":11,"disabled":8,"is_button":8,"separator":8,"align_right":8,"logged_in_only":8,"display_variant":13,"not_logged_in_only":8},"fac046b5-95e4-4683-9065-4f5631eca10c","\u002Fservices\u002Fsmart-htc","SmartHTC",{"id":413,"to":414,"icon":7,"items":8,"label":415,"target":10,"toggle":11,"command":7,"to_page":7,"visible":11,"disabled":8,"is_button":8,"separator":8,"align_right":8,"logged_in_only":8,"display_variant":13,"not_logged_in_only":8},"2b18d3e9-d191-4f55-8bf7-e5cbed8ba1a4","\u002Fservices\u002Fpassive-house-air-leakage-testing","Passive House Air Leakage Testing",{"id":417,"to":418,"icon":7,"items":8,"label":419,"target":10,"toggle":11,"command":7,"to_page":7,"visible":11,"disabled":8,"is_button":8,"separator":8,"align_right":8,"logged_in_only":8,"display_variant":13,"not_logged_in_only":8},"d5d9aba3-4fe3-4b5b-8c7b-fdda731bf96b","\u002Fservices\u002Fretrofit-air-leakage-testing","Retrofit Air Leakage Testing",{"id":421,"to":422,"icon":7,"items":8,"label":423,"target":10,"toggle":11,"command":7,"to_page":7,"visible":11,"disabled":8,"is_button":8,"separator":8,"align_right":8,"logged_in_only":8,"display_variant":13,"not_logged_in_only":8},"16f1de68-d8f9-4287-a377-9189fd9096b4","\u002Fservices\u002Fsound-insulation-testing","Sound Insulation Testing",{"id":425,"to":426,"icon":7,"items":8,"label":427,"target":10,"toggle":11,"command":7,"to_page":7,"visible":11,"disabled":8,"is_button":8,"separator":8,"align_right":8,"logged_in_only":8,"display_variant":13,"not_logged_in_only":8},"8edc23cb-d991-4cd7-8be3-05ac581623f2","\u002Fservices\u002Fventilation-flow-rate-testing","Ventilation Flow Rate Testing",{"id":429,"to":430,"icon":7,"items":8,"label":431,"target":10,"toggle":11,"command":7,"to_page":7,"visible":11,"disabled":8,"is_button":8,"separator":8,"align_right":8,"logged_in_only":8,"display_variant":13,"not_logged_in_only":8},"a499f916-be6d-417a-b74f-7d36840bf88d","\u002Fservices\u002Fbackground-ventilation-testing","Background Ventilation Testing",[433,437],{"id":434,"to":435,"icon":7,"items":8,"label":436,"target":10,"toggle":11,"command":7,"to_page":7,"visible":11,"disabled":8,"is_button":8,"separator":8,"align_right":8,"logged_in_only":8,"display_variant":13,"not_logged_in_only":8},"c729f2d1-c26a-4940-8bf6-31c57646a312","\u002Fservices\u002Fnew-build-conversion-domestic-epc-assessment","New Build\u002FConversion Domestic EPC Assessment",{"id":438,"to":439,"icon":7,"items":8,"label":440,"target":10,"toggle":11,"command":7,"to_page":7,"visible":11,"disabled":8,"is_button":8,"separator":8,"align_right":8,"logged_in_only":8,"display_variant":13,"not_logged_in_only":8},"a3a30524-718e-4c56-9698-d61b39645487","\u002Fservices\u002Fnew-build-conversion-commercial-epc-assessment","New Build\u002FConversion Commercial EPC Assessment",[442,446,450],{"id":443,"to":444,"icon":7,"items":8,"label":445,"target":10,"toggle":8,"command":7,"to_page":7,"visible":11,"disabled":8,"is_button":8,"separator":8,"align_right":8,"logged_in_only":8,"display_variant":13,"not_logged_in_only":8},"622430f3-825d-4f59-a3b9-a0aecece4371","\u002Fterms-and-conditions","Terms & Conditions",{"id":447,"to":448,"icon":7,"items":8,"label":449,"target":10,"toggle":8,"command":7,"to_page":7,"visible":11,"disabled":8,"is_button":8,"separator":8,"align_right":8,"logged_in_only":8,"display_variant":13,"not_logged_in_only":8},"0d050c9f-d69f-4fd0-ac64-6ae522d5d3bf","\u002Fprivacy-policy","Privacy Policy",{"id":451,"to":452,"icon":7,"items":8,"label":453,"target":454,"toggle":11,"command":7,"to_page":7,"visible":11,"disabled":8,"is_button":8,"separator":8,"align_right":8,"logged_in_only":8,"display_variant":13,"not_logged_in_only":8},"66a0a788-fbc0-4843-9502-6049e1b80796","https:\u002F\u002Fatspace-ltd.s3.eu-west-2.amazonaws.com\u002Fuploads\u002Fatspace-trade-credit-application-form.pdf","Trade Application","_blank",{"data":456},[457,463,468,473,478,484,490,494,498,502,507,512,515,519,524,529,534,539,543,548,553,557,558,561,565,570,573,577,580,585,589],{"id":458,"slug":459,"title":460,"created_at":461,"updated_at":461,"active_posts_count":462},12,"air-leakage-testing","Air Leakage Testing","2026-01-27T17:56:20.000000Z",14,{"id":464,"slug":465,"title":466,"created_at":461,"updated_at":461,"active_posts_count":467},13,"air-tightness-drawing-review","Air Tightness Drawing Review",11,{"id":37,"slug":469,"title":470,"created_at":471,"updated_at":471,"active_posts_count":472},"atspace-news","ATSPACE News","2026-01-27T17:56:09.000000Z",4,{"id":474,"slug":475,"title":476,"created_at":477,"updated_at":477,"active_posts_count":88},2,"building-regulations","Building Regulations","2026-01-27T17:56:02.000000Z",{"id":479,"slug":480,"title":481,"created_at":482,"updated_at":482,"active_posts_count":483},18,"commercial-air-testing","Commercial Air Testing","2026-01-27T17:56:31.000000Z",15,{"id":485,"slug":486,"title":487,"created_at":488,"updated_at":488,"active_posts_count":489},26,"condensation-risk-assessment","Condensation Risk Assessment","2026-01-27T17:57:26.000000Z",3,{"id":462,"slug":491,"title":492,"created_at":461,"updated_at":461,"active_posts_count":493},"diagnostic-air-pressure-testing","Diagnostic Air Pressure Testing",10,{"id":495,"slug":496,"title":497,"created_at":461,"updated_at":461,"active_posts_count":472},9,"diagnostic-sound-insulation-testing","Diagnostic Sound Insulation Testing",{"id":499,"slug":500,"title":353,"created_at":501,"updated_at":501,"active_posts_count":472},27,"energy-statements","2026-01-27T17:57:29.000000Z",{"id":503,"slug":504,"title":505,"created_at":506,"updated_at":506,"active_posts_count":472},5,"existing-build-commercial-epc-certification","Existing Build Commercial EPC Certification","2026-01-27T17:56:08.000000Z",{"id":508,"slug":509,"title":510,"created_at":511,"updated_at":511,"active_posts_count":474},20,"existing-domestic-epc-certification","Existing Domestic EPC Certification","2026-01-27T17:56:48.000000Z",{"id":489,"slug":513,"title":514,"created_at":477,"updated_at":477,"active_posts_count":483},"industry-news","Industry News",{"id":516,"slug":517,"title":518,"created_at":506,"updated_at":506,"active_posts_count":489},6,"new-build-commercial-epc-certification","New Build Commercial EPC Certification",{"id":520,"slug":521,"title":522,"created_at":523,"updated_at":523,"active_posts_count":489},21,"new-build-domestic-epc-certification","New Build Domestic EPC Certification","2026-01-27T17:56:53.000000Z",{"id":525,"slug":526,"title":527,"created_at":528,"updated_at":528,"active_posts_count":489},28,"over-glazed-extension-calculations","Over-glazed Extension Calculations","2026-01-27T17:57:32.000000Z",{"id":530,"slug":531,"title":532,"created_at":533,"updated_at":533,"active_posts_count":489},29,"overheating-assessment","Overheating Assessment","2026-01-27T17:57:36.000000Z",{"id":535,"slug":536,"title":537,"created_at":538,"updated_at":538,"active_posts_count":472},25,"passive-house-air-testing","Passive House Air Testing","2026-01-27T17:57:17.000000Z",{"id":540,"slug":541,"title":381,"created_at":542,"updated_at":542,"active_posts_count":503},16,"psi-values","2026-01-27T17:56:26.000000Z",{"id":544,"slug":545,"title":546,"created_at":547,"updated_at":547,"active_posts_count":467},24,"residential-air-testing","Residential Air Testing","2026-01-27T17:57:15.000000Z",{"id":549,"slug":550,"title":551,"created_at":552,"updated_at":552,"active_posts_count":489},22,"retro-fit-green-deal-assessment","Retro-fit - Green Deal Assessment","2026-01-27T17:56:55.000000Z",{"id":472,"slug":554,"title":357,"created_at":555,"updated_at":555,"active_posts_count":556},"sap-calculations","2026-01-27T17:56:06.000000Z",8,{"id":96,"slug":97,"title":98,"created_at":99,"updated_at":99,"active_posts_count":489},{"id":483,"slug":559,"title":361,"created_at":560,"updated_at":560,"active_posts_count":489},"sbem-calculations","2026-01-27T17:56:25.000000Z",{"id":562,"slug":563,"title":564,"created_at":542,"updated_at":542,"active_posts_count":472},17,"smart-htc","Smart HTC",{"id":566,"slug":567,"title":568,"created_at":569,"updated_at":569,"active_posts_count":489},23,"smoke-shaft-air-pressure-testing","Smoke Shaft Air Pressure Testing","2026-01-27T17:57:12.000000Z",{"id":493,"slug":571,"title":572,"created_at":461,"updated_at":461,"active_posts_count":472},"sound-insulation-design","Sound Insulation Design",{"id":574,"slug":575,"title":423,"created_at":576,"updated_at":576,"active_posts_count":503},19,"sound-insulation-testing","2026-01-27T17:56:37.000000Z",{"id":467,"slug":578,"title":579,"created_at":461,"updated_at":461,"active_posts_count":516},"sound-testing","Sound Testing",{"id":581,"slug":582,"title":583,"created_at":584,"updated_at":584,"active_posts_count":489},30,"u-value-calculations","U-Value Calculations","2026-01-27T17:57:49.000000Z",{"id":556,"slug":586,"title":587,"created_at":588,"updated_at":588,"active_posts_count":472},"ventilation-flow-rate","Ventilation Flow Rate","2026-01-27T17:56:10.000000Z",{"id":590,"slug":591,"title":365,"created_at":592,"updated_at":592,"active_posts_count":489},31,"water-efficiency-calculations","2026-01-27T17:57:51.000000Z",{"data":594},[595],{"id":88,"parent_id":7,"slug":89,"title":90,"created_at":91,"updated_at":92,"active_posts_count":489,"label":90}]