18 x New Build Apartments & 6 Houses

Written by ATSPACE | Feb 2, 2024 1:22:35 PM

Project Overview:
Our client, a renowned property developer in Birmingham, embarked on an ambitious project comprising 18 new-build apartments and 6 houses. The success of this endeavour hinged on adherence to stringent Building Regulations, particularly Parts L, F, and E. These regulations mandate compliance with air permeability, ventilation, and sound insulation standards, respectively.

Challenge:
The challenge was multifaceted. Firstly, the client's development progressed at varying speeds, with some plots advancing more rapidly than others. This necessitated a flexible testing approach capable of accommodating different stages of construction. Secondly, the client sought a solution to streamline the testing process, reducing both time and cost. This called for a single engineer capable of conducting both air permeability and sound insulation testing during the same site visits.

Our Solution:
To meet the client's unique needs, we devised a tailored approach. We assembled a team of experienced engineers well-versed in the requirements of Building Regulations Parts L, F, and E. These experts possessed the proficiency to conduct air permeability testing to measure the building's airtightness, ventilation assessments to ensure adequate airflow, and sound insulation testing to determine acoustic performance.

Furthermore, we coordinated our testing schedule in a manner that allowed for multiple site visits, accommodating the disparate progress rates of individual plots. This not only ensured that each unit met regulatory standards but also provided the client with the flexibility they required.

Result:
Our integrated approach and flexibility enabled the client to maintain construction progress while meeting and even exceeding regulatory standards. We successfully conducted air permeability, ventilation, and sound insulation testing over multiple site visits. This approach reduced the client's costs and streamlined the regulatory compliance process.

By adapting to the client's unique project requirements, we helped them create a development in Birmingham that not only met Building Regulations but also provided an enhanced living experience for future residents, ensuring comfortable environments with optimal energy efficiency and acoustic isolation. This case exemplifies our commitment to delivering customised solutions to meet our clients' specific needs in the construction industry.