Case Studies

Wells Conversion

Written by ATSPACE | Nov 24, 2023 11:06:05 AM

Client's Challenge: The client's initial focus was on achieving compliance with Part L (Conservation of Fuel and Power) of the building regulations. They were unaware of the additional compliance requirements related to water efficiency (Part G), air permeability (Part L), and ventilation (Part F). This oversight could have caused significant delays and potential issues during the construction process.

Our Approach:

  1. Initial Assessment: After the client's inquiry, our team conducted an initial assessment of the project's requirements. It became evident that the client needed a broader range of services to ensure complete compliance with building regulations.
  2. Customised Solutions: We provided a tailored package that included SAP assessments to address their initial concern while also incorporating water efficiency calculations, air permeability testing, and ventilation testing into our services.
  3. Efficient Coordination: Our team seamlessly coordinated with the client's construction team to ensure minimal disruption to their project schedule. We scheduled the required tests and assessments at convenient times to avoid delays in construction.

Challenges Faced: Integrating additional services into the project posed some logistical challenges, such as aligning testing schedules with construction milestones. However, our experienced team managed these challenges effectively to ensure a smooth process.

Results:

  1. Regulatory Compliance: Our comprehensive services ensured that the client's properties met all relevant building regulations, including Part L, Part G, Part F, and Part L1A.
  2. Efficiency and Cost Savings: By bundling these services together, the client benefited from cost savings and streamlined processes. They avoided the complications and potential fines associated with non-compliance.
  3. Client Satisfaction: The client expressed their satisfaction with our professionalism, expertise, and commitment to their project. They acknowledged that our guidance and services exceeded their expectations.
  4. Timely Completion: Despite the added complexity of incorporating multiple assessments and tests, we completed the project on schedule, preventing any delays in the construction timeline.

Conclusion: ATSPACE Ltd. successfully provided a comprehensive compliance solution to a client initially seeking SAP assessments. By addressing the client's needs for water efficiency calculations, air permeability testing, and ventilation testing, we not only ensured regulatory compliance but also contributed to a smooth construction process. Our client's satisfaction underscores our commitment to delivering high-quality services tailored to individual project requirements. This case study exemplifies our ability to adapt and provide holistic solutions to meet the evolving needs of our clients in the construction industry.