FAQs

When Do I Actually Have to Complete the Water Calculator?

Written by ATSPACE | Aug 2, 2022 11:40:42 AM

The Water Calculator will be completed initially when fittings and appliances are specified during the design stage of the project and then revised if those fittings subsequently change during the construction and fitting out stage. The regulations require only that the notice states the potential consumption, however, at ATSPACE we prepare you a detailed report enabling you to submit a completed copy of the calculations to Building Control.