When is the Part F Testing Carried Out?

Written by ATSPACE | Aug 2, 2022 1:16:39 PM

The Part F Ventilation Testing is carried out once the building has been completed. The building does not need to be decorated or have floor coverings fitted however all aspects of the ventilation system should have been commissioned and fully operational.

All Part F testing is carried out by one of our BPEC accredited engineers, using UKAS calibrated equipment. We will require the following:
• For each dwelling to be tested, a list of fan manufacturers, model numbers and installation location
• All fans to be tested must be installed and operational
• All trickle vents must be installed and set in the open position
• All windows and doors to be fitted and set in the closed position