Helping our customers through the building control maze

We get it. The world of building compliance can be a bit of a minefield. And there’s nothing worse than being faced with red tape.

That’s why we’ve put together a hub of information – from checklists to videos and regulatory documents to ensure you’re clued up every step of the way.

Of course, our experts are always on hand if you need further support and advice on your project. Just drop us an email or give us a call.

No video selected

Select a video type in the sidebar.

Select from these filters to display
the appropriate files below:


FAQ

Your Questions Answered

Click on a category below to find answers to the most common questions we’re asked. If you want to find out more please contact us.

FAQ - graphic 1

Filter Options

How Can ATSPACE Help?

Here at ATSPACE, we have our own in-house certified On Construction Domestic Energy Assessors (OCDEAs) and we pride ourselves in being able to provide our customers, from home owners to national construction companies, with a professional, experienced and fast turnaround for all aspects of our SAP/EPC service.

In addition to preparing the SAP Calculations, which take into account many factors of energy consumption such as heating systems, insulation, air tightness, ventilation, lighting and U-value calculations – we also have the building construction skills and expertise to advise on methods of construction and fabrication to ensure that your development achieves the optimum levels of energy efficiency.

What Other Services Do I Need to Consider in Relation to Part F Ventilation Testing?
Design Stage

Drawing Review/Advice & Guidance
SAP Calculations & PEA

Construction Phase
Pre-test Inspections
Contracting Services

As-built Stage
Air Permeability Tests & Certification
SAP Calculations & EPC
Smoke Testing

 
 
How Can ATSPACE Help?
ATSPACE have an experienced, in-house team of BINDT & BPEC accredited test engineers. We have successfully carried out Part F Ventilation Testing on all types of ventilation systems across the UK.

When combined with our Part L Air Testing Service, we are able to carry out your Part F Ventilation Test in a single on-site visit – saving you money.

 
 
What Does The Ventilation Test Entail?

Using UKAS calibrated equipment, our BPEC accredited engineers measure the air flow rate for each individual component of the ventilation system e.g. cooker hoods and extraction fans.

Overall, testing is a simple process, with each test only lasting a few minutes. The engineer will measure and record the air flow rates for each component using an anemometer which generates the readings.

Upon successful completion of the testing, our BPEC accredited engineer will provide the appropriate certification for submission to your local building control.

 
 
When is the Part F Testing Carried Out?

The Part F Ventilation Testing is carried out once the building has been completed. The building does not need to be decorated or have floor coverings fitted however all aspects of the ventilation system should have been commissioned and fully operational.

All Part F testing is carried out by one of our BPEC accredited engineers, using UKAS calibrated equipment. We will require the following:
• For each dwelling to be tested, a list of fan manufacturers, model numbers and installation location
• All fans to be tested must be installed and operational
• All trickle vents must be installed and set in the open position
• All windows and doors to be fitted and set in the closed position

 
 
 
What Ventilation Systems are Covered in the Regulations for Ventilation Part F?

There are 4 types of ventilation system covered by the Buildings Regulations:

• SYSTEM 1 – Intermittent fans e.g. extract fans and background ventilation e.g. trickle vents
• SYSTEM 2 – Passive stack – which provides natural ventilation e.g. chimney. Testing is not required for this type of system
• SYSTEM 3 – Continuous mechanical extract ventilation (MEV). Typically, these are continuously operating extract fans that are installed in kitchens and bathrooms
• SYSTEM 4 – Continuous mechanical balanced ventilation with heat recovery.

The performance rates for each system type detailed in Part F are the minimum requirements necessary to ensure that adequate air quality is provided for the occupants indoors. The occupant’s health could be at risk if these ventilation rates are compromised.

Under normal circumstances, we are able to carry out Part F testing alongside our on-site Air Pressure Test, thereby enabling you to achieve both Part L and Part F compliance in the most time-efficient, cost-effective manner.

 
What is the Aim of the Regulations for Ventilation Part F?

In October 2010, Part F of the Building Regulations was issued and this placed an increased emphasis around the requirement for effective design, installation and operation of ventilation systems.

The overall aim of the regulations is to maximise CO₂ reduction through optimally designed systems, competent system installation and verification of performance once the system has been installed and in operation by the home owner.

In order to provide additional advice and guidance on how to conform to the revised regulations of October 2010, the Domestic Ventilation Compliance Guide was also introduced. Download your copy.

 
What is Ventilation Testing Part F All About?

The Building Regulations L1A & L1B require that buildings are designed to be more air tight, thereby reducing CO₂ emissions and becoming more energy efficient. However, this removes a source of ventilation and if the installed ventilation system is not operating efficiently, then the building could attract damp and condensation issues, especially during prolonged periods where the windows are kept closed.

Part F of the Building Regulations introduced more stringent ventilation requirements for buildings and it is of equal importance that any installed ventilation systems are fit for purpose, balanced and commissioned correctly to ensure optimum levels of operation. Additionally, the regulations also state “there shall be adequate means of ventilation provided for people in the building”.

Part F of the Building Regulations requires that MHVR Systems (Mechanical Ventilation and Heat Recovery) and intermittent extractor fans (e.g. kitchen & bathroom) have their flow rates checked, are working efficiently and the relevant test results submitted to building control as part of the overall building compliance process.

 
What Other Services Do I Need to Consider in Relation to Sound Insulation Testing?

Design stage
Drawing Review / Advice and Guidance
SAP Calculations & PEA

Construction phase
Pre-test Inspections
Contracting Services

As-built stage
Air Tests & Certification
SAP Calculations & EPC
Smoke Testing

 
When Do I Need Daylight Calculations?

Over recent years there has been a significant increase in the importance of environmental concerns – and – local councils continue to place greater significance on considering the effect that proposed developments will have on the daylight and sunlight levels received by neighbouring properties.

For this reason, many local authorities now require daylight and solar shading calculations and ‘right of light’ assessments to be submitted in support of planning applications – and ATSPACE will provide you with the services of a fully certified assessor to evaluate the daylight efficiency of your project and produce the necessary evidence and reports to support your planning application.

Furthermore, measuring daylight efficiency is part of the requirement for both BREEAM and the Code for Sustainable Homes – and the data from daylight calculations can be used to obtain appropriate ‘credits’ at appraisal time.

What Is The Knowledge Hub?

Building Compliance Just Got Easier!

The LARGEST knowledge bank in our industry. We have a complete directory of videos answering YOUR Questions.

Our knowledge hub is jam packed with original video content based on what YOU’RE asking. You Ask, We Answer…

If it’s a popular question we will feature it on our knowledge Hub

Fame at last...

What's Your Question?

Trusted by 9K+ businesses
taylor wimpey
logo-mace
Willmott_Dixon_logo
hill
taylor wimpey
logo-mace
Willmott_Dixon_logo
hill
taylor wimpey
logo-mace

Or Fill in our Form

Fill out the form in as much detail as you can. This way, we can provide you with a realistic quote. Our promise is to get back to you in less than 24 hours.

Which Services Are you Enquiring about?

(Tick all that apply)

Copyright © 2022 Atspace Ltd. Website Design by Insynth Marketing Ltd.