Sound Testing

By Keith Markham, Building Compliance Engineer
Unless your dwelling is completely detached, or built to registered Robust Details standard, you will need to comply with Part E of the Building Regulations by undertaking pre-completion sound testing. These regulations apply to new builds, material change of use conversions, and residential rooms.
Approved Document E pre-completion testing specifically measures airborne sound transmission between internal separating walls and floors, as well as impact sound transmission through separating floors. Noise from external environmental sources such as railways or roads falls under local planning conditions and BS 8233 assessments rather than Building Regulations Part E.
To demonstrate compliance with Approved Document E (Resistance to the passage of sound), separating party walls and floors must meet mandatory airborne and impact acoustic thresholds. On-site sound testing measures sound level differences across dividing assemblies to satisfy Building Control requirements:
- Purpose-built new dwellings (walls): Minimum airborne sound insulation of DnT,w + Ctr of 45 dB or greater.
- Purpose-built new dwellings (floors): Minimum airborne sound insulation of DnT,w + Ctr of 45 dB or greater, and maximum impact sound transmission L'nT,w of 62 dB or lower.
- Material change of use conversions (walls): Minimum airborne sound insulation of DnT,w + Ctr of 43 dB or greater.
- Material change of use conversions (floors): Minimum airborne sound insulation of DnT,w + Ctr of 43 dB or greater, and maximum impact sound transmission L'nT,w of 64 dB or lower.
To prepare the site for compliance assessment, contractors must ensure specific physical prerequisites are completed before sound testing commences:
- Dedicated 240V mains power (13A sockets) must be operational within both source and receiver rooms.
- All external windows and external doors must be fully glazed, fitted, and closed during testing.
- Internal doors must be hung and close tight against their frame stops to prevent flanking sound paths.
- Separating and flanking walls must be fully dry-lined or plastered, with sockets, switches, and service penetrations sealed with acoustic mastic.
- Floors must remain bare subfloors; temporary floor coverings, carpets, and underlay must not be fitted prior to testing unless they form an integral structural component of the tested assembly.
- Quiet background conditions are required across the site, with no noisy trades or generators running in adjacent plots.
BREEAM
There are two elements which are Hea 05 Acoustic Performance (Health and Wellbeing), and Pol 05. The aim of Hea 05 is to meet the following acoustic principles of:
-
1. Sound Insulation
-
2. Indoor ambient noise level
-
3. Reverberation times
Pol 05: Reduction of noise pollution. This credit aims to reduce the likelihood of noise arising from fixed building services installations affecting neighbouring noise-sensitive buildings.
A project involving BREEAM will include appointing an acoustic consultant in the early stages of the design requirement, highlighting any potential risks or concerns. This is then followed up with a design brief so all credits can be obtained through the various criteria.
ATSPACE Ltd conducts BREEAM acoustic calculations and design appraisals across commercial and residential developments. When construction is complete, verified sound testing confirms performance against specified targets. Speak with your dedicated account manager to co-ordinate testing schedules.
Listed Buildings
Due to the constraints with listed buildings, there are limitations with what can be done to the existing floors and walls. Even if the building doesn’t meet standards, building control can have the authority to sign these developments off if the developer has carried out and implemented a design with considerable means that all has been done to improve the sound insulation. Best practice is to obtain current performance of the walls and floors and adopt a design demonstrating an upgraded result followed by a further set of tests to confirm improvement.
ATSPACE engineers conduct diagnostic pre-works and post-refurbishment sound testing for listed and historic properties to establish acoustic baselines and provide Building Control bodies with empirical data on achieved performance gains. Please enquire now to move your project forward.
Article authored by Keith Markham, Building Compliance Engineer at ATSPACE Ltd. Keith has extensive field experience delivering Part E sound insulation testing and ventilation commissioning across residential and commercial developments throughout England and Wales.