Call
+44 345 6465 454
callcenter person
Get a quote

atspace engineer with checklist

DEC’s and accompanying Advisory Reports are required on all buildings with a total useful floor are in excess of 500m² that are occupied by public authorities and visited by the public.

For the purposes of the regulations, a building is described as a roofed construction having walls, for which energy is used to condition the indoor climate, and a reference to a building includes a reference to a part of the building which has been designed or altered to be used separately.

From July 2015, these regulations have been further extended and DEC’s will be required to be displayed for all such buildings that are in excess of 250m².

 
Previous Article: Why is a Display Energy Certificate Required? Next Article: What is an Advisory Report?
Trusted by 9K+ businesses
hill
taylor wimpey
logo-mace
Willmott_Dixon_logo
Copyright © 2022 Atspace Ltd. Website Design by Insynth Marketing Ltd.