Call
+44 345 6465 454
callcenter person
Get a quote

atspace engineer with checklist

Not necessarily – compliance with Building Regulations Part L1B is automatically achieved if:
• The envelope of the extension is sufficiently well insulated
• Glazing is within the extension does not exceed 25% of the floor area
• Building services within the extension are of a sufficient standard.

However when considering an extension, it is advisable to speak with your local building control to determine what level of detail will be required in the SAP Assessment submission.

 
Previous Article: What is Sample Testing? Next Article: Do I Need a SAP Assessment For a Conservatory?

"ATSPACE has provided , and continues to provide, an outstanding service to a high standard."

Andy Gilliver, Persimmon Homes

Results

 

 

"A very prompt and efficient service that dealt with every aspect of my requirements in a professional way. If you're in need of any testing requirements to meet building regulations I'd recommend ATSPACE every time."

Mynott Associates Limited

Results

"We have Found ATSPACE Services reliable, professional and friendly at a competitive Price."

Lyndsay Thrower, Taylor Wimpey

Results

"Thank you for the Smoke shaft Air Pressure Test. The whole experience with ATSPACE has been a pleasure from the start and we are looking forward to working with you on the next job.”

Brian Keane, C.E.O, Cameron Ventures Group

Results

"Just a note to thank ATSPACE for the excellent service received on this most recent project. Your engineer put himself out to ensure that the Smoke shaft Air Pressure Test was carried out with the minimum of fuss (in a very tricky environment) and was a pleasure to have on site."

Olly Wigg Director, Bowson Leeway Homes

Results

Testimonials

Trusted by 9K+ businesses
hill
taylor wimpey
logo-mace
Willmott_Dixon_logo
Copyright © 2022 Atspace Ltd. Website Design by Insynth Marketing Ltd.