Call
+44 345 6465 454
callcenter person
Get a quote

atspace engineer with checklist

There are 4 types of ventilation system covered by the Buildings Regulations:

• SYSTEM 1 – Intermittent fans e.g. extract fans and background ventilation e.g. trickle vents
• SYSTEM 2 – Passive stack – which provides natural ventilation e.g. chimney. Testing is not required for this type of system
• SYSTEM 3 – Continuous mechanical extract ventilation (MEV). Typically, these are continuously operating extract fans that are installed in kitchens and bathrooms
• SYSTEM 4 – Continuous mechanical balanced ventilation with heat recovery.

The performance rates for each system type detailed in Part F are the minimum requirements necessary to ensure that adequate air quality is provided for the occupants indoors. The occupant’s health could be at risk if these ventilation rates are compromised.

Under normal circumstances, we are able to carry out Part F testing alongside our on-site Air Pressure Test, thereby enabling you to achieve both Part L and Part F compliance in the most time-efficient, cost-effective manner.

 
Previous Article: What is the Aim of the Regulations for Ventilation Part F? Next Article: When is the Part F Testing Carried Out?

"ATSPACE has provided , and continues to provide, an outstanding service to a high standard."

Andy Gilliver, Persimmon Homes

Results

 

 

"A very prompt and efficient service that dealt with every aspect of my requirements in a professional way. If you're in need of any testing requirements to meet building regulations I'd recommend ATSPACE every time."

Mynott Associates Limited

Results

"We have Found ATSPACE Services reliable, professional and friendly at a competitive Price."

Lyndsay Thrower, Taylor Wimpey

Results

"Thank you for the Smoke shaft Air Pressure Test. The whole experience with ATSPACE has been a pleasure from the start and we are looking forward to working with you on the next job.”

Brian Keane, C.E.O, Cameron Ventures Group

Results

"Just a note to thank ATSPACE for the excellent service received on this most recent project. Your engineer put himself out to ensure that the Smoke shaft Air Pressure Test was carried out with the minimum of fuss (in a very tricky environment) and was a pleasure to have on site."

Olly Wigg Director, Bowson Leeway Homes

Results

Testimonials

Trusted by 9K+ businesses
hill
taylor wimpey
logo-mace
Willmott_Dixon_logo
Copyright © 2022 Atspace Ltd. Website Design by Insynth Marketing Ltd.