Call
+44 345 6465 454
callcenter person
Get a quote

atspace engineer with checklist

The Building Regulations L1A & L1B require that buildings are designed to be more air tight, thereby reducing CO₂ emissions and becoming more energy efficient. However, this removes a source of ventilation and if the installed ventilation system is not operating efficiently, then the building could attract damp and condensation issues, especially during prolonged periods where the windows are kept closed.

Part F of the Building Regulations introduced more stringent ventilation requirements for buildings and it is of equal importance that any installed ventilation systems are fit for purpose, balanced and commissioned correctly to ensure optimum levels of operation. Additionally, the regulations also state “there shall be adequate means of ventilation provided for people in the building”.

Part F of the Building Regulations requires that MHVR Systems (Mechanical Ventilation and Heat Recovery) and intermittent extractor fans (e.g. kitchen & bathroom) have their flow rates checked, are working efficiently and the relevant test results submitted to building control as part of the overall building compliance process.

 
Previous Article: What Other Services Do I Need to Consider in Relation to Sound Insulation Testing? Next Article: What is the Aim of the Regulations for Ventilation Part F?

"ATSPACE has provided , and continues to provide, an outstanding service to a high standard."

Andy Gilliver, Persimmon Homes

Results

 

 

"A very prompt and efficient service that dealt with every aspect of my requirements in a professional way. If you're in need of any testing requirements to meet building regulations I'd recommend ATSPACE every time."

Mynott Associates Limited

Results

"We have Found ATSPACE Services reliable, professional and friendly at a competitive Price."

Lyndsay Thrower, Taylor Wimpey

Results

"Thank you for the Smoke shaft Air Pressure Test. The whole experience with ATSPACE has been a pleasure from the start and we are looking forward to working with you on the next job.”

Brian Keane, C.E.O, Cameron Ventures Group

Results

"Just a note to thank ATSPACE for the excellent service received on this most recent project. Your engineer put himself out to ensure that the Smoke shaft Air Pressure Test was carried out with the minimum of fuss (in a very tricky environment) and was a pleasure to have on site."

Olly Wigg Director, Bowson Leeway Homes

Results

Testimonials

Trusted by 9K+ businesses
hill
taylor wimpey
logo-mace
Willmott_Dixon_logo
Copyright © 2022 Atspace Ltd. Website Design by Insynth Marketing Ltd.