Call
+44 345 6465 454
callcenter person
Get a quote

atspace engineer with checklist

In simple terms – without an SBEM Calculation you cannot begin the construction project!

SBEM Calculations (Simplified Building Energy Model) are a requirement of the Building Regulations Part L2 and must be submitted to building control at two stages in the development process:
• Design stage – Prior to commencement of the development project, an SBEM Calculation must be submitted to your local building control, alongside your application
• As-built stage – Upon completion of the building phase, it is required that both an SBEM Calculation and an EPC are submitted prior to sign-off by building control.

Our Assessors normally begin the process during discussions with developers, architects and designers – often playing a key role in helping our clients to reduce long-term energy costs – because of their skills and expertise of being able to recommend optimum levels of insulation and assessing the benefits of more efficient building services.

In helping our customers through the SBEM process we will be happy to undertake on-site visits, carry out measured surveys and execute the required level of Air Leakage Testing, Smoke Testing and Thermography prior to preparation of the final SBEM Reports and their subsequent filing on the Landmark database.

 
Previous Article: What is the Driving Force Behind These Regulations? Next Article: How is SBEM Calculated?

"ATSPACE has provided , and continues to provide, an outstanding service to a high standard."

Andy Gilliver, Persimmon Homes

Results

 

 

"A very prompt and efficient service that dealt with every aspect of my requirements in a professional way. If you're in need of any testing requirements to meet building regulations I'd recommend ATSPACE every time."

Mynott Associates Limited

Results

"We have Found ATSPACE Services reliable, professional and friendly at a competitive Price."

Lyndsay Thrower, Taylor Wimpey

Results

"Thank you for the Smoke shaft Air Pressure Test. The whole experience with ATSPACE has been a pleasure from the start and we are looking forward to working with you on the next job.”

Brian Keane, C.E.O, Cameron Ventures Group

Results

"Just a note to thank ATSPACE for the excellent service received on this most recent project. Your engineer put himself out to ensure that the Smoke shaft Air Pressure Test was carried out with the minimum of fuss (in a very tricky environment) and was a pleasure to have on site."

Olly Wigg Director, Bowson Leeway Homes

Results

Testimonials

Trusted by 9K+ businesses
hill
taylor wimpey
logo-mace
Willmott_Dixon_logo
Copyright © 2022 Atspace Ltd. Website Design by Insynth Marketing Ltd.