Call
+44 345 6465 454
callcenter person
Get a quote

atspace engineer with checklist

If you are undertaking a conversion of an existing building, the initial SAP Calculations must be prepared at design stage for the property and submitted to local building control before any development work commences.

Once the conversion works have been completed an as-built SAP Calculation is prepared and will incorporate any design changes that have occurred along with the finalised details regarding heating, hot water and ventilation systems that have been installed.

The finalised SAP Reports are then produced for submission to building control together with an On Construction Energy Performance Certificate (EPC) which is required by building control prior to the issue of the completion certificate and also for the subsequent sale or let of the property.

Previous Article: What Other Services Do I Need to Consider in Relation to SAP/EPC? Next Article: What is Sound Insulation Testing All About?

"ATSPACE has provided , and continues to provide, an outstanding service to a high standard."

Andy Gilliver, Persimmon Homes

Results

 

 

"A very prompt and efficient service that dealt with every aspect of my requirements in a professional way. If you're in need of any testing requirements to meet building regulations I'd recommend ATSPACE every time."

Mynott Associates Limited

Results

"We have Found ATSPACE Services reliable, professional and friendly at a competitive Price."

Lyndsay Thrower, Taylor Wimpey

Results

"Thank you for the Smoke shaft Air Pressure Test. The whole experience with ATSPACE has been a pleasure from the start and we are looking forward to working with you on the next job.”

Brian Keane, C.E.O, Cameron Ventures Group

Results

"Just a note to thank ATSPACE for the excellent service received on this most recent project. Your engineer put himself out to ensure that the Smoke shaft Air Pressure Test was carried out with the minimum of fuss (in a very tricky environment) and was a pleasure to have on site."

Olly Wigg Director, Bowson Leeway Homes

Results

Testimonials

Trusted by 9K+ businesses
hill
taylor wimpey
logo-mace
Willmott_Dixon_logo
Copyright © 2022 Atspace Ltd. Website Design by Insynth Marketing Ltd.