Call
+44 345 6465 454
callcenter person
Get a quote

atspace engineer with checklist

What is involved
• The test is carried out between a pair of rooms separated by a party wall or floor.
• It involves setting up a noise source in the room on one side of the party wall or floor and measuring this noise on the other side of the partition.
• We will require simultaneous access to both sides of the wall or floor
• In the interest of health and safety, we cannot allow anyone in the room that we are testing to or from as the equipment emits a sound over 100 Db.

Required site conditions
• Quiet conditions will be required – with no work at all near the rooms in question.
• Staff should be informed of the Sound Testing programme and be prepared to leave punctually as required.
• External noisy activity within control of the site manager should be stopped.
• ATSPACE should also be informed of any other noisy activity likely to be occurring on the test day e.g.roadworks.
• The tests are likely to last several hours – depending on the number of tests involved.

 

 

Previous Article: What Does The Sound Insulation Test Entail? Next Article: What Happens After My Sound Insulation Test?

"ATSPACE has provided , and continues to provide, an outstanding service to a high standard."

Andy Gilliver, Persimmon Homes

Results

 

 

"A very prompt and efficient service that dealt with every aspect of my requirements in a professional way. If you're in need of any testing requirements to meet building regulations I'd recommend ATSPACE every time."

Mynott Associates Limited

Results

"We have Found ATSPACE Services reliable, professional and friendly at a competitive Price."

Lyndsay Thrower, Taylor Wimpey

Results

"Thank you for the Smoke shaft Air Pressure Test. The whole experience with ATSPACE has been a pleasure from the start and we are looking forward to working with you on the next job.”

Brian Keane, C.E.O, Cameron Ventures Group

Results

"Just a note to thank ATSPACE for the excellent service received on this most recent project. Your engineer put himself out to ensure that the Smoke shaft Air Pressure Test was carried out with the minimum of fuss (in a very tricky environment) and was a pleasure to have on site."

Olly Wigg Director, Bowson Leeway Homes

Results

Testimonials

Trusted by 9K+ businesses
hill
taylor wimpey
logo-mace
Willmott_Dixon_logo
Copyright © 2022 Atspace Ltd. Website Design by Insynth Marketing Ltd.