Call
+44 345 6465 454
callcenter person
Get a quote

atspace engineer with checklist

The Sound Insulation Test is carried out after the second-fix stage. The following checklist, prior to testing needs to have been completed:


• Windows and external doors need to have been installed, glazed and closable
• Window trickle vents should be installed and closed (or temporarily blocked for testing)
• All internal doors should be in place and hung
• Power, TV/satellite and power sockets should be fitted and in place
• All wall surfaces in rooms to be tested must be completed
• Floors and ceiling surfaces are completed
• Cornices and skirting boards are in place
• Ideally carpets should not have been fitted in rooms to be tested (however – if carpet has been glued to the floor the regulations permit the use of a board placed on the carpet for impact testing)
• Where laminates and vinyl form part of the standard construction – testing can be carried out with these in place.
• Rooms to be tested should be clean and tidy
• No other trades should be working in the dwelling during the test
• Access will be required to the properties on both sides of the floor/walls to be tested
• 240v power is live (110V is allowable by prior arrangement)

Additionally, if you are unsure about any aspects of the sound insulation process prior to testing, ATSPACE will be happy to provide you with a design review – to review drawings and advise on appropriate sound insulation methods.

 

 

Previous Article: How Much Sound Insulation Testing is Required? Next Article: What Does The Sound Insulation Test Entail?

"ATSPACE has provided , and continues to provide, an outstanding service to a high standard."

Andy Gilliver, Persimmon Homes

Results

 

 

"A very prompt and efficient service that dealt with every aspect of my requirements in a professional way. If you're in need of any testing requirements to meet building regulations I'd recommend ATSPACE every time."

Mynott Associates Limited

Results

"We have Found ATSPACE Services reliable, professional and friendly at a competitive Price."

Lyndsay Thrower, Taylor Wimpey

Results

"Thank you for the Smoke shaft Air Pressure Test. The whole experience with ATSPACE has been a pleasure from the start and we are looking forward to working with you on the next job.”

Brian Keane, C.E.O, Cameron Ventures Group

Results

"Just a note to thank ATSPACE for the excellent service received on this most recent project. Your engineer put himself out to ensure that the Smoke shaft Air Pressure Test was carried out with the minimum of fuss (in a very tricky environment) and was a pleasure to have on site."

Olly Wigg Director, Bowson Leeway Homes

Results

Testimonials

Trusted by 9K+ businesses
hill
taylor wimpey
logo-mace
Willmott_Dixon_logo
Copyright © 2022 Atspace Ltd. Website Design by Insynth Marketing Ltd.