Call
+44 345 6465 454
callcenter person
Get a quote

atspace engineer with checklist

In the fast-paced realm of construction, time is often of the essence. This case study outlines the successful implementation of a rapid SAP (Standard Assessment Procedure) calculation for a new-build residential property, with the ambitious goal of completing the entire process within just five days. This project aimed to streamline the SAP assessment, ensuring compliance with energy efficiency standards while expediting the construction timeline.

Background: The project involved a new-build residential property in East Sussex, and compliance with SAP calculations was critical for meeting regulatory requirements and obtaining necessary approvals. Traditionally, SAP calculations are intricate and time-consuming, requiring careful consideration of factors such as insulation, heating systems, and renewable energy sources. The client, facing tight deadlines for construction, sought a solution to expedite the SAP calculation process without compromising accuracy.

Methodology: Collaborative Planning: Engaging key stakeholders, including architects, engineers, and energy consultants, from the project's inception was crucial. A collaborative approach allowed for streamlined data gathering and a clear understanding of the project's energy efficiency goals.

Data Automation: Leveraging advanced software tools, we automated the collection and input of relevant data into the SAP calculation system. This not only minimised the risk of human error but also significantly reduced the time traditionally spent on manual data entry.

Parallel Processing: Rather than following a sequential workflow, we adopted a parallel processing approach. This involved dividing the SAP calculation tasks among multiple teams to work concurrently on different aspects of the assessment. This not only expedited the process but also allowed for continuous cross-verification of data.


Expert Consultation: To ensure accuracy in the fast-tracked SAP calculation, experts in SAP assessments were consulted throughout the process. Their insights and guidance helped identify potential bottlenecks and ensured compliance with regulatory standards.


Results: The approach to fast-tracking the SAP calculation for the new-build residential property yielded exceptional results. The entire assessment, which conventionally might have taken weeks, was successfully completed within the stipulated five-day timeframe given by our assessor.

Conclusion: This case study showcases the effectiveness of a strategic and collaborative approach to fast-tracking SAP calculations for new-build residential properties. By embracing technology, parallel processing, and expert consultation, the project not only met regulatory standards but also exemplified the potential for efficiency gains in the broader construction industry. The success of this endeavour underscores the importance of innovation and adaptability in navigating the challenges of modern construction projects.

Previous Article: Demystifying Energy Performance Certificates (EPCs) for UK Building Compliance Next Article: Navigating the New UK Building Regulations: What Developers Need to Know About Part L and Part O

"ATSPACE has provided , and continues to provide, an outstanding service to a high standard."

Andy Gilliver, Persimmon Homes

Results

 

 

"A very prompt and efficient service that dealt with every aspect of my requirements in a professional way. If you're in need of any testing requirements to meet building regulations I'd recommend ATSPACE every time."

Mynott Associates Limited

Results

"We have Found ATSPACE Services reliable, professional and friendly at a competitive Price."

Lyndsay Thrower, Taylor Wimpey

Results

"Thank you for the Smoke shaft Air Pressure Test. The whole experience with ATSPACE has been a pleasure from the start and we are looking forward to working with you on the next job.”

Brian Keane, C.E.O, Cameron Ventures Group

Results

"Just a note to thank ATSPACE for the excellent service received on this most recent project. Your engineer put himself out to ensure that the Smoke shaft Air Pressure Test was carried out with the minimum of fuss (in a very tricky environment) and was a pleasure to have on site."

Olly Wigg Director, Bowson Leeway Homes

Results

Testimonials

Trusted by 9K+ businesses
hill
taylor wimpey
logo-mace
Willmott_Dixon_logo
Copyright © 2022 Atspace Ltd. Website Design by Insynth Marketing Ltd.