You should carry out ventilation testing once power is available and you have installed the ventilation systems, which are fully functional and operational. The duration of the test depends on the size of the property and the number of ventilation units. 

Ventilation testing is part F of the building regulations. It is sensible to have the test carried out as soon as the system is operational, but not necessarily when the building is completely finished. If you have any issues following the testing, it may be necessary to carry out remedial or refitting works to rectify any issues. Obviously, any additional unforeseen works could impair the final finish of the building.  

Ventilation testing is carried out with an anemometer and an air flow hood. The anemometer is attached to the hood, and then the hood is placed over the vent to be tested. By using purpose-made equipment, we can verify the air flow measurements for all the extractor fans within a building. 

Once the Ventilation test is complete, a Ventilation or Extractor test certificate will be issued. 

ATSPACE test engineers are qualified to carry out ventilation testing on the different types of ventilation usually installed. 

  • •  Intermittent fans (System 1)

  • •  Continuous Intermittent fans (System 2)

  • •  Mechanical Extract Ventilation (System 3)

  • •  Mechanical Extract Ventilation with Heat Recovery (System 4)

  •  

  

Previous Article: How Can I Improve My SAP Calculations? Next Article: Why Is Building Air Tight Important?

"ATSPACE has provided , and continues to provide, an outstanding service to a high standard."

Andy Gilliver, Persimmon Homes

Results

 

 

"A very prompt and efficient service that dealt with every aspect of my requirements in a professional way. If you're in need of any testing requirements to meet building regulations I'd recommend ATSPACE every time."

Mynott Associates Limited

Results

"We have Found ATSPACE Services reliable, professional and friendly at a competitive Price."

Lyndsay Thrower, Taylor Wimpey

Results

"Thank you for the Smoke shaft Air Pressure Test. The whole experience with ATSPACE has been a pleasure from the start and we are looking forward to working with you on the next job.”

Brian Keane, C.E.O, Cameron Ventures Group

Results

"Just a note to thank ATSPACE for the excellent service received on this most recent project. Your engineer put himself out to ensure that the Smoke shaft Air Pressure Test was carried out with the minimum of fuss (in a very tricky environment) and was a pleasure to have on site."

Olly Wigg Director, Bowson Leeway Homes

Results

Testimonials

Trusted by 9K+ businesses
hill
taylor wimpey
logo-mace
Willmott_Dixon_logo
Copyright © 2022 Atspace Ltd. Website Design by Insynth Marketing Ltd.