Call
+44 345 6465 454
callcenter person
Get a quote

atspace engineer with checklist

To comply with the criteria set out in Part E of the Buildings Regulations you will need to ensure your dwelling completes a sound insulation test. This is to ensure that your build demonstrates acceptable levels of airborne and impact noise levels. These regulations apply to both new build and refurbishments or conversions on all types of dwellings.

Airborne sound refers to noise that is directly transferred via ‘air’ and includes things such as televisions etc. Impact sound refers to any noise that is transmitted through impact itself via connecting floors or walls. There are two main types of procedure to test such noise levels. An airborne sound test uses a noise machine which emits a level of white noise from one room to the next. Impact sound levels are tested by using a tapping machine which can simulate such things as footsteps. The results from both of these tests are accumulated and recorded in compliance with the information as set out in the building regulations.

It is important to be aware of the acoustic design as implementing the wrong type of design or materials into your build can have a negative impact on your sound insulation test results. Maintaining the usage of high end construction materials will set you in good stead to pass this test. The test itself will take place at Pre-completion stage which means that all doors are in place, windows and trickle vents should be fitted and there should also be power on site. It is beneficial, as with all compliance testing, to gain professional advice at an early stage to ensure that you receive that pass.

ATSPACE offer sound insulation testing and undertake such procedures on a daily basis. Should you require anymore information regarding this building compliance, or any other, then please get in contact with a member of our friendly team who will be happy to assist you with your enquiries.

Previous Article: Air Leakage Testing Next Article: SAP Testing

"ATSPACE has provided , and continues to provide, an outstanding service to a high standard."

Andy Gilliver, Persimmon Homes

Results

 

 

"A very prompt and efficient service that dealt with every aspect of my requirements in a professional way. If you're in need of any testing requirements to meet building regulations I'd recommend ATSPACE every time."

Mynott Associates Limited

Results

"We have Found ATSPACE Services reliable, professional and friendly at a competitive Price."

Lyndsay Thrower, Taylor Wimpey

Results

"Thank you for the Smoke shaft Air Pressure Test. The whole experience with ATSPACE has been a pleasure from the start and we are looking forward to working with you on the next job.”

Brian Keane, C.E.O, Cameron Ventures Group

Results

"Just a note to thank ATSPACE for the excellent service received on this most recent project. Your engineer put himself out to ensure that the Smoke shaft Air Pressure Test was carried out with the minimum of fuss (in a very tricky environment) and was a pleasure to have on site."

Olly Wigg Director, Bowson Leeway Homes

Results

Testimonials

Trusted by 9K+ businesses
hill
taylor wimpey
logo-mace
Willmott_Dixon_logo
Copyright © 2022 Atspace Ltd. Website Design by Insynth Marketing Ltd.