Call
+44 345 6465 454
callcenter person
Get a quote

atspace engineer with checklist

A good air tightness result is a figure that enables your SAP calculation to pass. The better the final air tightness test result, the better the energy calculation, which in turn means the final EPC (Energy Performance Certificate) will have a higher rating. The better the result and tighter the building, the more efficient your property will be. This will cost you a lot less to run in heating and lighting bills, and energy efficiency will be better. 

The EPC will provide you with an estimate of what those costs will be. The building should be tested as soon as it is complete, as all the final finish has been completed and the best chance of a successful result is possible. 

The more advanced the build and final finish, the better the result will be. Most leakage points will be sealed, the better the finish, the better the result. 

The air tightness test of a building is guided by a set target within the energy calculation (SAP or SBEM). The overall calculation determines the target figure. This target figure must be met or bettered to pass the air tightness test. 

Currently, the maximum leakage rate allowed within the energy calculation is 10m3/(hr*m2) @50 Pa. Although the maximum leakage rate allowed within the energy calculation is 10m3/(hr*m2) @50 Pa, this number is usually lower, as it is common for the energy assessor to lower the target score to enable the calculation to pass. 

Air tightness testing is a mandatory requirement of Part L of the building regulations for a new build property, whether residential or commercial. All new build buildings must be tested. 

  •  
Previous Article: At What Stage of The Build Do I Need an Air Tightness Test? Next Article: How is an Air Pressure Test Carried Out?

"ATSPACE has provided , and continues to provide, an outstanding service to a high standard."

Andy Gilliver, Persimmon Homes

Results

 

 

"A very prompt and efficient service that dealt with every aspect of my requirements in a professional way. If you're in need of any testing requirements to meet building regulations I'd recommend ATSPACE every time."

Mynott Associates Limited

Results

"We have Found ATSPACE Services reliable, professional and friendly at a competitive Price."

Lyndsay Thrower, Taylor Wimpey

Results

"Thank you for the Smoke shaft Air Pressure Test. The whole experience with ATSPACE has been a pleasure from the start and we are looking forward to working with you on the next job.”

Brian Keane, C.E.O, Cameron Ventures Group

Results

"Just a note to thank ATSPACE for the excellent service received on this most recent project. Your engineer put himself out to ensure that the Smoke shaft Air Pressure Test was carried out with the minimum of fuss (in a very tricky environment) and was a pleasure to have on site."

Olly Wigg Director, Bowson Leeway Homes

Results

Testimonials

Trusted by 9K+ businesses
hill
taylor wimpey
logo-mace
Willmott_Dixon_logo
Copyright © 2022 Atspace Ltd. Website Design by Insynth Marketing Ltd.