Temporary sealing is only permitted on extraction fans, ventilation systems or unconnected waste pipes. 

All windows and doors should be fully fitted and working. Make sure they are well sealed prior to any test. Access doors, including internal garage doors, cannot be temporarily sealed in advance of the test and should be air tight. Close trickle vents. 

Ensure all service (water, gas, electric) entry points are sealed. Where waste pipes exit the building, make sure they are properly sealed, where boxed in, make sure the boxing is sealed. 

Loft hatches should be fitted. Skirting boards should be fitted and sealed. Pay particular attention to any plumbing or electrical work, ensure the work is complete and all sockets are fitted. Radiator and boiler pipes are sealed. 

Sanitary fittings should have water in the traps. If they are not fitted, make sure the waste pipes are temporarily sealed. Check the waste pipe for the washing machine, and sink waste is capped if not in use. 

A power supply should be connected to the building or available. If possible parking close to the property, depending on the size of the property, there could be quite a lot of kit required for the air test. 

At ATSPACE, we aim to deliver beyond compliance. Every air test that we carry out, the client will receive a checklist prior to our visit with helpful tips to ensure that you can achieve the air test result that you require. 

Take a copy of the floor plan for the building to be tested, and draw a line around the external envelope. Every point where this line is penetrated is a possible source of leakage during the air tightness test.  

In short, ensure the finish is complete. The better the finish, the better the result. 



Previous Article: How Do I Stop Noise From Upstairs Floors? Next Article: What Do I Need to Look Out For to Minimise Air Leakage?

"ATSPACE has provided , and continues to provide, an outstanding service to a high standard."

Andy Gilliver, Persimmon Homes

Results

 

 

"A very prompt and efficient service that dealt with every aspect of my requirements in a professional way. If you're in need of any testing requirements to meet building regulations I'd recommend ATSPACE every time."

Mynott Associates Limited

Results

"We have Found ATSPACE Services reliable, professional and friendly at a competitive Price."

Lyndsay Thrower, Taylor Wimpey

Results

"Thank you for the Smoke shaft Air Pressure Test. The whole experience with ATSPACE has been a pleasure from the start and we are looking forward to working with you on the next job.”

Brian Keane, C.E.O, Cameron Ventures Group

Results

"Just a note to thank ATSPACE for the excellent service received on this most recent project. Your engineer put himself out to ensure that the Smoke shaft Air Pressure Test was carried out with the minimum of fuss (in a very tricky environment) and was a pleasure to have on site."

Olly Wigg Director, Bowson Leeway Homes

Results

Testimonials

Trusted by 9K+ businesses
hill
taylor wimpey
logo-mace
Willmott_Dixon_logo
Copyright © 2022 Atspace Ltd. Website Design by Insynth Marketing Ltd.